All4Certs Exam Archive Free Sharing CertBus Updated SAP C_TSCM42_65 VCE and PDF Exam Practice Materials

Free Sharing CertBus Updated SAP C_TSCM42_65 VCE and PDF Exam Practice Materials

Categories :

Tens of thousands of competitors, pages of hard questions and unsatisfied exam preparation situations… Do not worried about all those annoying things! We, CertBus, help you with your SAP SAP Application Associate C_TSCM42_65 SAP Certified Application Associate – Production – Planning and Manufacturing with SAP ERP 6.0 EHP5 exam. CertBus will assist you clear the C_TSCM42_65 exam with SAP Application Associate C_TSCM42_65 PDF and VCE questions. CertBus exam dumps are the most comprehensive ones.

We CertBus has our own expert team. They selected and published the latest C_TSCM42_65 preparation materials from SAP Official Exam-Center: http://www.certgod.com/C_TSCM42_65.html

QUESTION NO:16

You maintained the planning strategy group 10 (make-to-stock production) in the material master

(SAP ECC) of a material. For the coming months you have planned requirements with requirement

type LSF (derived from the main strategy 10). Now, you want to change the requirement type from

LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for

requirements in the existing production plan.

Which of the following statements are applicable in this case? (Choose two)

A. You can enter the strategy group 40 in the material master and change the present requirement

7

for the product manually in the production plan.

B. You must change the requirement type for planning strategy 10 to VSF in Customizing. The

requirement type for all existing requirements is then changed by the next planning run.

C. You can change the strategy group from 10 to 40 for the existing production plan in the material

master, and the requirement type for all requirements is changed automatically.

D. You can enter the strategy group 40 in the material master, but the requirement type is not

changed automatically for existing requirements.

Answer: A,D


QUESTION NO:4

When analyzing the SAP ECC order report for a planned order for a finished product, you discover

that one of the assemblies will not be available in time for the scheduled final assembly because of

automatic forward scheduling.

Which planning procedure do you use to create a feasible production plan from a requirements

planning perspective?

A. Interactive single-item planning for the delayed assembly

B. Multi-level single-item planning with the “simulation mode” option

C. Total planning online

D. Multi-level single-item planning with the “display material list” option

Answer: B


QUESTION NO:13

When modeling in-house production using SAP ECC, on which business levels can you create a

bill of material (BOM)? (Choose two)

A. At the client level

B. At the plant level

C. At the company code level

D. At the business area level

Answer: A,B

6


QUESTION NO:15

In which master data object do you set the standard values for an operation?

A. Work Center

B. Production Resource/Tool (PRT)

C. Material Master

D. Routing

Answer: D


QUESTION NO:1

What features related to process orders can be used to fulfill Good Manufacturing Practices

(GMP) requirements? (Choose three)

A. Availability check

B. Digital signature

C. Resource selection

D. Electronic batch record

E. Approved master recipes

Answer: B,D,E


QUESTION NO:8

Which of the following functions does SAP Supply Chain Management (SCM) offer?

A. Planning and optimization of supply chains across company boundaries.

B. Optimization of the procurement strategy with the supplier pool.

C. Product development, safety, quality, and maintenance.

D. Communication to customers through different interaction channels.

Answer: A


QUESTION NO:14

What could be a consequence of the confirmation of an operation?

A. Settlement of the actual costs

B. Reduction of capacity requirements

C. Rescheduling of the production order

D. Update of the planned costs

Answer: B


QUESTION NO:6

Which functions can be triggered before releasing a production order? (Choose three)

A. Confirmation

3

B. Selection of a routing

C. Scheduling

D. Stock determination

E. Selection of a BOM

Answer: B,C,E


QUESTION NO:5

What does SAP ERP mean?

A. SAP ERP is a planning system in which extended planning processes can be mapped.

B. SAP ERP is a system hardware that includes modules for purchasing, sales and distribution,

materials management, production and so on.

C. SAP ERP is a technological platform, on the basis of which customer-specific extensions can

be imported.

D. SAP ERP is an application that an enterprise can use to manage its business processes

efficiently.

Answer: D


QUESTION NO:2

Which of the following statements about consumption are correct? (Choose two)

A. Consumption takes place on the material level between the planned independent requirements

and the planned orders.

B. Consumption parameters (consumption mode and consumption interval) can be set in the

material master or in the MRP group.

C. Consumption is restructured with the planning run.

D. Consumption can take place between order reservations and planned independent

requirements, depending on the strategy.

Answer: B,D


CertBus exam braindumps are pass guaranteed. We guarantee your pass for the C_TSCM42_65 exam successfully with our SAP materials. CertBus SAP Certified Application Associate – Production – Planning and Manufacturing with SAP ERP 6.0 EHP5 exam PDF and VCE are the latest and most accurate. We have the best SAP in our team to make sure CertBus SAP Certified Application Associate – Production – Planning and Manufacturing with SAP ERP 6.0 EHP5 exam questions and answers are the most valid. CertBus exam SAP Certified Application Associate – Production – Planning and Manufacturing with SAP ERP 6.0 EHP5 exam dumps will help you to be the SAP specialist, clear your C_TSCM42_65 exam and get the final success.

C_TSCM42_65 Latest questions and answers on Google Drive(100% Free Download): https://drive.google.com/file/d/0B_3QX8HGRR1mTDllMEw3S3dTYk0/view?usp=sharing

C_TSCM42_65 SAP exam dumps (100% Pass Guaranteed) from CertBus: http://www.certgod.com/C_TSCM42_65.html [100% Exam Pass Guaranteed]

Why select/choose CertBus?

Millions of interested professionals can touch the destination of success in exams by certgod.com. products which would be available, affordable, updated and of really best quality to overcome the difficulties of any course outlines. Questions and Answers material is updated in highly outclass manner on regular basis and material is released periodically and is available in testing centers with whom we are maintaining our relationship to get latest material.

BrandCertbusTestkingPass4sureActualtestsOthers
Price$45.99$124.99$125.99$189$69.99-99.99
Up-to-Date Dumps
Free 365 Days Update
Real Questions
Printable PDF
Test Engine
One Time Purchase
Instant Download
Unlimited Install
100% Pass Guarantee
100% Money Back
Secure Payment
Privacy Protection