[Newest Version] Easily Pass 9A0-315 Exam with CertBus Updated Real Adobe 9A0-315 Exam Materials
100% candidates have passed the 9A0-315 exam by the help of CertBus pass guaranteed 9A0-315 preparation materials. The CertBus Adobe PDF and VCEs are the latest and cover every knowledge points of 9A0-315 Adobe Illustrator CS6 Recertification Exam certifications. You can try the questions and answerss for an undeniable success in 9A0-315 exam.
We CertBus has our own expert team. They selected and published the latest 9A0-315 preparation materials from Adobe Official Exam-Center: http://www.certgod.com/9A0-315.html
QUESTION NO: 47
The First Failure Data Capture (FFDC) is a diagnostic component of WebSphere Application
Server and serves a very specific role. Which of the following descriptions BEST defines the role
of FFDC?
A. The First Failure Data Capture tool preserves the information generated from a processing
failure and returns control to the affected engines. The captured data is saved in a log file for
use in analyzing the problem.
B. The First Failure Data Capture tool preserves the information generated from a processing
failure and forces the application server to shut down.
C. The First Failure Data Capture tool preserves the information generated from a processing
failure and invokes the Collector tool to take a snapshot of the system environment.
D. The First Failure Data Capture tool preserves the information generated from a processing
failure and forces the application server to do a thread dump.
Answer: A
QUESTION NO:140
An HTTP adapter is deployed on a Worklight server. Which steps need to be taken by the developer to
receive data from the adapter in an application?
A. Create an invocationData object that contains the adapter and procedure names and send it through
the WL.Server.invokeProcedureAPI with the onSuccess and onFailure callbacks.
B. Create an invocationData object that contains the adapter and procedure names and send it through
the WL.Client.invokeProcedureAPI with the onSuccess and onTimeout callbacks.
C.
Create an invocationData object that contains the adapter and procedure names and send it through
the WL.Client.invokeProcedureAPI with the onSuccess and onFailure callbacks.
D.
Create an invocationData object that contains the backend URL and procedure name and send it
through theWL.Client.invokeProcedure API with the onSuccess and onTimeout callbacks.
Correct Answer: C
QUESTION NO: 213
A customer tries to restore a file and keeps getting an error that the file is unavailable due to
media errors. How can the file be restored?
A. run a restore using a copy of the storage pool
B. run audit volume fix=no, then rerun the restore
C. run an audit and mark the media as damaged, then run mitigate restore
D. run an audit, mark the volume as damaged, restore the volume from copy pool,then rerun a
restore of data
Answer: D
QUESTION NO: 8
A Power 720 is being used to build 2 environments: Test and Production, with 2 LPARs in each
environment. Processor resources must be separated between the Test and Production environments to
reduce possible contention, while still being able to share processor resources inside each own
environment. What are the two features required, as a minimum, to accomplish this? (Select 2)
A. IVM
B. HMC
C. PowerVM Express
D. PowerVM Standard
E. IVE
F. IBM Systems Director
Correct Answer: BD
QUESTION NO:147
An administrator is installing Worklight Server on a stand-alone machine in a QA environment and has
already performed the following steps: 1.Created and initialized the Worklight databases 2.Defined and
configured the required application server resources Which additional step must the administrator perform
to use the Worklight Console to verify successful installation?
A. Deploy the Worklight Console adapter file.
B. Install the Worklight sample customization WAR file.
C.
Set the worklight.home JVM custom property to the location of the Worklight Console folder.
D.
Copy the worklight-jee-library.jar file to the application server’s Worklight library folder.
Correct Answer: B