Don’t worry about how to get yourself well prepared your BCP-340 exam! CertBus will work you out of your BCP-340 exam with the latest updated BCP-340 Support. BB 10 Devices and amp; BB Device Svc. in Enterprise Envir PDF and VCE dumps. CertBus provides the latest real BlackBerry BCP-340 exam preparation material, covering every aspect of BCP-340 exam curriculum.

We CertBus has our own expert team. They selected and published the latest BCP-340 preparation materials from BlackBerry Official Exam-Center: http://www.certgod.com/BCP-340.html

QUESTION NO:17

An administrator wants to ensure a job on the scheduler is ignored if the system is in a restricted state at the time it is scheduled to run. What change will make this occur?

A. Change the recovery action of the job schedule entry to *NOSBM.

B. Change the user profile on the job schedule entry to QRECOVERY.

C. Change the frequency option of the job schedule entry to *ACTIVE.

D. Use the option on the WRKJQBSCDE screen for “hold when restricted.”

Correct Answer: A

QUESTION NO: 85

A secondary site is being deployed for application availability and site failover. Servers of identical model

and type have been ordered and delivered to the new location. Additional PowerVM activation keys were

obtained for the original location to allow more than 32000 WWNs and enable Active Memory Sharing

(AMS).

How can the duplicate systems be updated to enable these additional features?

A. Create a system plan of the existing configuration and deploy this to the duplicate configuration.

B. The activation keys must be exported using the PowerVM option within the Capacity On Demand

(CoD) panel on the HMC.

C. Activation keys are generated for a specific system and must be generated for each new server in the

failover site.

D. Contact IBM Support to generate the one-time password required to administer the PowerVM activation

keys.

Correct Answer: C

QUESTION NO:92

A customer has an IBM System Storage Enterprise Storage Server and several EMC CX3 systems

installed in a data center, attached to IBM System p servers. As a step toward data consolidation, they

intend to put all data on a new DS8700. What would be the most important data migration factors to

consider?

A. sector size and the amount of production data

B. existing RAID levels and the disk drive speed

C. sector size and existing RAID levels

D. amount of production data and the disk drive speed

Correct Answer: D

QUESTION NO:15

Several IBM i partitions at a customer site provide outdated contact information to IBM when problems are reported. Which command should be used to correct the contact information?

A. CHGSVCCFG

B. CHGCNTINF

C. SNDSRVRQS *UPD

D. WRKCNTINE, option 2

Correct Answer: D

QUESTION NO:76

A customer has two data centers, 500 kilometers apart. The customer requests a proposal for new

storage subsystems and a disaster recovery solution that provides consistent data in the event of a

disaster at the local site. Which IBM System Storage DS8000 solution should the storage specialist

propose to the client?

A. Metro/Global Mirror

B. Metro Mirror

C. Global Copy

ExamReal.com — 100% Real QandAs | 100% Real Pass

D. Global Mirror

Correct Answer: D