CertBus New Updated RDCR201 Exam Dumps Free Download
CertBus provides the most up to date and accurate preparing materials of the RDCR201 certification exam questions and answers , testing software, exam PDF and VCE files to help you prepare your RDCR201 Business Objects Certified Professional – Crystal Reports 2008 – Level One exam. What training you are looking for? Come to visit our site and choose CertBus online certification materials, you will get a quick and cost-efficient way to become a Business-Objects certified professional in IT industry.
We CertBus has our own expert team. They selected and published the latest RDCR201 preparation materials from Business-Objects Official Exam-Center: http://www.certgod.com/RDCR201.html
QUESTION NO:37
A solution implementer needs to set up a DataPower Integration XI52 Appliance in a data center with the
firmware release 5.0.0.x.
The appliance was shipped with the newer 5.0.0.y firmware. The solution implementer needs to install the
older release 5.0.0.x firmware.
The company maintains all firmware images on an internal server at http://repository. Which CLI command
sequence should the solution implementer use to achieve this firmware version downgrade?
A. xi52# su admin
xi52# flash
xi52(config-flash)# copy http://repository/5.0.0.x.scrypt3 image:5.0.0.x.scrypt3
xi52(config-flash)# boot 5.0.0.x.scrypt3 rollback
B. xi52(config)# flash
xi52(config-flash)# copy http://repository/5.0.0.x.scrypt3 image:5.0.0.x.scrypt3
xi52(config-flash)# boot rollback
C. xi52# configure terminal
xi52(config)# copy http://repository/5.0.0.x.scrypt3 image:5.0.0.x.scrypt3
xi52(config)# flash
xi52(config-flash)# boot image 5.0.0.x.scrypt3
D. xi52# configure terminal
xi52(config)# copy http://repository/5.0.0.x.scrypt2 image:5.0.0.x.scrypt2
xi52(config)# flash
xi52(config-flash)# boot image 5.0.0.x.scrypt2
Correct Answer: C
QUESTION NO:29
Companycom wants to apply a PTF to the p5 590 system. After doing a preview install, the output
shows there is insufficient space in the /usr filesystem. The root volume group has no available
physical partitions left. They do not want to add additional disk drives to the system, but have a
jfs2 filesystem that is only 8% used. What could they do to utilize space in the jfs2 filesystem to
apply this PTF?
A. Backup the filesystem and recreate smaller
B. Use the chfs to reduce the filesystem size
C. Use cplv to copy filesystem to smaller size
D. Use migratepv to copy filesystem to smaller size
Answer: B
QUESTION NO: 165
When protecting data using the NetApp SnapLock licensed feature with IBM Tivoli Storage
Manager, a retention date is set for the FILE volume through the SnapLock interface. This date is
calculated by which parameter?
A. Reclamation Type: SNAPLOCK
B. Reclamation Type: THRESHOLD
C. RETVER and RETMIN parameters of the backup copy group
D. RETVER and RETMIN parameters of the archive copy group
Answer: D
QUESTION NO: 95
A system administrator wishes to create a configuration archive in order to create a similar
configuration on another system. Using the “Admin Task exportServer” functionality within
wsadmin, it is possible to export a configuration archive for which of the following items?
A. An application module
B. An enterprise application
C. A stand-alone application Server
D. A federated profile
Answer: C
QUESTION NO:1
For the p5 590 and p5 595 servers, the HMC must be directly attached. Why is the use of a
private service network between HMC and the p5 590 required?
A. The Bulk Power Controllers are dependent upon the HMC to provide them with DHCP
addresses.
B. A firewall is required to isolate the private network from any of the open networks to which the
HMC is attached.
C. Network communications can be implemented through an open network. No private network is
required but it is recommended.
D. All p5 590 and 595 servers are shipped with one service processor card. A private network is
required to manage DHCP addresses.
Answer: A