QUESTION NO: 3
Which of these graphs demonstrates conditions which would be sufficient to enable OCAP for the
process?
A. Xbar Chart
B. Time Series Chart
C. Neither
D. Both
Correct Answer: A
QUESTION NO: 9
When a Belt Poka-Yoke’s a defect out of the process entirely then she should track the activity with a
robust SPC system on the characteristic of interest in the defect as an early warning system.
A. True
B. False
Correct Answer: B
QUESTION NO: 8
If the production is for higher volume and monitoring and the Mean and variability is to be monitored for
four machines producing product and the characteristic to be monitored is Variable Data, which SPC Chart
is best to be selected?
A. Xbar-R Chart
B. Individual-MR Chart
C. NP Chart
D. CUSUM Chart
Correct Answer: A
QUESTION NO: 10
Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a
_____________ so those involved in the process know what to do when the critical metrics move out of
spec.
A. Response Plan
B. Call List
C. Chain-of-Command
D. Defect Analysis Plan
Correct Answer: A
QUESTION NO: 1
A ___________ is used primarily to track the stability of the average value of a metric of interest.
A. NP Chart
B. Xbar-R Chart
C. I-MR Chart
D. C Chart
Correct Answer: B
QUESTION NO: 14
What conclusion is most correct about the Experimental Design shown here with the response in the far
right column?
A. No factor has enough statistical confidence greater than 95% to have an impact on the response rate
B. Constant, Adv and Bev are the only factors statistically affecting the response rate with 95% confidence
or more
C. If the Adv is increased from the low level to the high level, the response rate increases
D. The response level is statistically concluded to only need the Adv and Bev factors set at the low level to
get the largest response rate
E. This design does not have enough experimental runs to conclude anything as evidenced by the lack of
P-values in the MINITABTM output
Correct Answer: D
QUESTION NO: 5
Common and ______________ Cause Variation are the focus of Statistical Process Control.
A. Uncommon
B. Ordinary
C. Special
D. Selective
Correct Answer: C
QUESTION NO: 13
Upon completion and validation of an improvement to a process a Belt and the Project Team create a
Control Plan that contains which of these?
A. Standard operating work description of the process change
B. Description of the monitoring system in place to assure continued compliance
C. Summary of the targeted critical metrics for process performance measurement
D. All of the above
Correct Answer: D
QUESTION NO: 7
Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of
the ______________.
A. Histograms
B. SPC Charts
C. NP Charts
D. Pareto Charts
Correct Answer: B
QUESTION NO: 2
For her injection molding project a Belt needed to track the percentage of defectives of a particular sample
set so she used a ___________ to display the data?
A. Individual Chart
B. C Chart
C. Xbar Chart
D. P Chart
Correct Answer: D
CSSBB Latest questions and answers on Google Drive(100% Free Download): https://drive.google.com/file/d/0B_3QX8HGRR1mRkFLdFNxTFZOUjg/view?usp=sharing
CSSBB exam dumps (100% Pass Guaranteed) from CertBus: http://www.certgod.com/ [100% Exam Pass Guaranteed]
Why select/choose CertBus?
Millions of interested professionals can touch the destination of success in exams by certgod.com. products which would be available, affordable, updated and of really best quality to overcome the difficulties of any course outlines. Questions and Answers material is updated in highly outclass manner on regular basis and material is released periodically and is available in testing centers with whom we are maintaining our relationship to get latest material.