As a leading IT exam study material provider, CertBus not only provides you the ENOV-VPM-NAV-101-515 exam questions and answers but also the most comprehensive knowledge of the whole ENOV-VPM-NAV-101-515 V5 ENOVIA VPM Navigator Specialist-V5R15 certifications. We provide our users with the most accurate ENOV-VPM-NAV-101-515 V5 ENOVIA VPM Navigator Specialist-V5R15 study material about the ENOV-VPM-NAV-101-515 exam and the guarantee of pass. We assist you to get well prepared for ENOV-VPM-NAV-101-515 certification which is regarded valuable the IT sector.
We CertBus has our own expert team. They selected and published the latest ENOV-VPM-NAV-101-515 preparation materials from Dassault Systemes Official Exam-Center: http://www.certgod.com/ENOV-VPM-NAV-101-515.html
QUESTION NO:41
A GUI Editor for editing XML documents is being built. It has a view where the XML document
can be presented in a tree form. One of the requirements is that a user should be able to visually
select one or more nodes, and cut and paste them into another destination node. A parser that
conforms to the DOM API implementation is used for XML processing. Which of the following
types provided by the DOM API can be BEST used to temporarily store the nodes that have been
cut and later to append them to the destination node?
A. Document
B. DocumentFragment
C. NodeList
D. NodeMap
Answer: B
QUESTION NO:44
A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their
Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the
sites. They utilize Tivoli Storage Manager for backups. They would like to replace a Microsoft Windows
server at the main site with a server at the DR site with a minimal amount of downtime. Which method will
achieve their goals?
A. locate the Tivoli Storage Manager data set for the server at the DR site, do a full backup, recover the
data to the DS6800, and make the data availableto the server B. create RMC relationships for all of the
data on the server to the DS6800, shut down the server, and make the data available to the new server
B.
shut down the server,create RMC relationships for all of the data on the server to the DS6800, and
make the data available to the new server
C.
recover the TSM backups to the DS6800 at the remote site, and make the data available to the new
ExamReal.com — 100% Real QandAs | 100% Real Pass
server
Correct Answer: B
QUESTION NO:70
Companycom has successfully established their p5 LPAR environment on a POWER5 p5 590
running AIX 5.2. They are now ready to move to Virtual IO. What would be required to do Virtual
IO?
A. Apply APAR IY62262 to the current AIX 5.2 Maintenance level 04. Virtual IO Server is not
required.
B. Purchase Advanced POWER Virtualization software, upgrade to AIX 5.3 maintenance level 1
and apply APAR IY60349. Virtual IO Server is not required.
C. Verify that there are enough resources to add a Virtual IO Server, upgrade to AIX 5.3 with
APAR IY60349, create a Virtual IO Server after applying APAR IY62262.
D. Verify that there are enough resources to add a Virtual IO Server, create a Virtual IO Server
and apply APAR IY62262, verify that the system is at AIX 5.2 with Maintenance level 04.
Answer: C
QUESTION NO:8
Companycom has a p5 595 running 12 LPARs. They are interested in high bandwidth, secure
communication between two of the LPARs within the p5 595 server. They do not have any
unused Ethernet adapters. Which of the following recommendations will best meet this
requirement?
A. Utilize the integrated 10/100/1000 network interface
B. Implement Virtual Ethernet to enable inter-partition communication
C. Implement shared Ethernet with the Ethernet adapters utilized in the other LPARs
D. Implement a Point to Point protocol serial communication between the p5 595 serial ports
Answer: B
QUESTION NO: 41
A developer executes the Release Order agent to release all the orders that are in the Schedule
status. On execution of the agent, the developer observes that some of the orders have not moved
to the Release status. Where can the developer check for possible reasons for the orders not
moving to the Release status?
A. Check the YFS_Order_Header table to ensure that the order exists.
B. Check the Task_Q_Key column of the YFS_TASK_Q table to ensure that it has the correct
Order Number.
C. Check the Available_Date column of YFS_TASK_Q table to ensure that the orders are
available for processing.
D. Check the ModifyUserId column of the YFS_Task_Q table to ensure that the user has
permissions to modify the order status.
Answer: C
Explanation: