CertBus provides the most up to date and accurate preparing materials of the ISFS certification exam questions and answers , testing software, exam PDF and VCE files to help you prepare your ISFS Information Security Foundation based on ISO/IEC 27002 exam. What training you are looking for? Come to visit our site and choose CertBus online certification materials, you will get a quick and cost-efficient way to become a EXIN certified professional in IT industry.

We CertBus has our own expert team. They selected and published the latest ISFS preparation materials from EXIN Official Exam-Center: http://www.certgod.com/ISFS.html

QUESTION NO:138

An IBM Worklight hybrid application supports Android 2.3 phones and tablets. It needs to be extended to

support Android 4 phones and tablets. After installing the Android 4 SDK, how can the IBM Worklight

Studio be used to accomplish this?

ExamReal.com — 100% Real QandAs | 100% Real Pass

A. Add a new application, environment, and create skins for Android 4 phones and tablets.

B. Add a new environment to existing application for Android 4, and create skins for Android 4 phones and

tablets.

C.

Add new skins for Android 4 phones and tablets to the existing Android environment, and

programmatically determine which skin to use atruntime.

D.

Add new skins for Android 4 phones and tablets to the existing Android environment, and let

the runtime determine which skin to useautomatically.

Correct Answer: C

QUESTION NO:104

An administrator maintains a IBM i 6.1 development system with weekly PTF updates so the current cumulative, appropriate groups and current HIPER PTEs are always present for testing.

An upgrade to IBM i 7.1 is planned for the system.

What is critical for making certain that current fixes will also be present on the new release?

A. The PTF cross-reference PSP document

B. The Cumulative PTE contents PSP document

C. The IBM i Upgrade and Corrections PSP document

D. The IBM i Memo to Users Corrections PSP document

Correct Answer: A

QUESTION NO:23

A large customer is consolidating their pSeries systems onto a p5 590. They will have a

requirement for a single device (disk, lun) to have multiple paths through different adapters in a

single LPAR. The primary applications were written for AIX 5.2. Which of the following would be

the recommended solution to satisfy this requirement?

A. Assign the adapters to a Virtual IO partition

B. Use the MPIO function included in AIX 5.2

C. Migrate the application to AIX 5.3 and use the MPIO function

D. Set up two Virtual IO partitions and attach both partitions to the device

Answer: B

QUESTION NO:155

A developer needs to debug an adapter procedure with the Invoke Worklight Procedure tool. What is

required to debug the procedure?

A. connectivity to the adapter’s backend source

B. a running Jetty server to invoke the procedure

C. a filtered.xsl file to transform the response from the backend

D. an application connected to the adapter to view the invocation results

ExamReal.com — 100% Real QandAs | 100% Real Pass

Correct Answer: A

QUESTION NO:36

A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows,

and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the

steps needed to install the latest adapter drivers. What is the best document the Business Partner can

suggest to accomplish this requirement?

A. the IBM System Storage DS8000 Interoperability Matrix

B. the IBM System Storage DS8000 Introduction and Planning Guide

C. the IBM System Storage DS8000 Host System Attachment Guide

D. the IBM System Storage DS8000 User’s Guide

Correct Answer: C