As a leading IT exam study material provider, CertBus not only provides you the EX0-107 exam questions and answers but also the most comprehensive knowledge of the whole EX0-107 SCNP Strategic Infrastructure Security certifications. We provide our users with the most accurate EX0-107 SCNP Strategic Infrastructure Security study material about the EX0-107 exam and the guarantee of pass. We assist you to get well prepared for EX0-107 certification which is regarded valuable the IT sector.

We CertBus has our own expert team. They selected and published the latest EX0-107 preparation materials from EXIN Official Exam-Center: http://www.certgod.com/EX0-107.html

QUESTION NO:96

A customer has purchased three IBM System Storage DS8700 systems and would like to have their

administrators trained. Which training alternative provides the necessary training with the least financial

impact?

A. purchase the training CD for the disk subsystem and have the staff do self-paced training

B. have the IBM Service Support Representative perform the training

C. contact IBM Education Services for an onsite training class

D. send one person at a time to an IBM training session

Correct Answer: C

QUESTION NO: : 40

Which statement is true when planning to upgrade IBM Tivoli Access Manager for e-

business V6.0 components to IBM Tivoli Access Manager for e-business V6.1.1 and those

components coexist in the same server with an instance of IBM Tivoli Directory Server

V6.0?

A. It is not necessary to install or upgrade any IBM Tivoli Directory Server component.

B. It is necessary to upgrade only the IBM Tivoli Directory Server V6.0 client to level V6.1.

C. It is necessary to upgrade IBM Tivoli Directory Server V6.0 server and client to level

V6.1.

D. It is necessary to install only the IBM Tivoli Directory Server V6.1 client that can coexist

with IBM Tivoli Directory Server V6.0 server and client.

Answer: D

Explanation:

QUESTION NO: 1

After a test run, the tester sums up all the individual requests response times but discovers that

the total is not equal to the overall page response time. What are three causes of the difference?

(Choose three.)

A. There is a defect in IBM Rational Performance Tester 8.2 that will be fixed in the next fix pack.

B. The page response time is more than the sum of the requests because it accounts for time

taken to set up the connections.

C. The page response time is less than the sum of the requests because several requests could

have been executed concurrently.

D. The page response time is more than the sum of the requests because custom code for

response correlation in a page is executed serially and is added to the page response time.

E. The page response time is less than the sum of the requests because the response for the

request is in the system cache.

Answer: B,C,D

QUESTION NO:58

A global customer’s IT strategy is based upon two DS8000 systems and an N series gateway. They want

to protect their business by implementing a disaster recovery solution. The storage specialist has

recommended cascaded mirroring. Which of the following is the business benefit of cascaded replication?

A. it is cost efficient, as a single N series or DS8000 can have its controllers split between the primary and

secondary site and use semi-synchronousmirroring while using asynchronous mirroring to a third site

B. the second site acts as a repeater station so that greater geographical distances can be achieved

ExamReal.com — 100% Real QandAs | 100% Real Pass

C. it provides high availability together with disaster recovery by implementing Metro/Global Mirror across

three geographically dispersed systems

D.

it guarantees data protection by implementing two synchronous copies of the primary site data

Correct Answer: C

QUESTION NO:114

An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC

storage infrastructure. The customer dissatisfaction has arisen during the installation because according to

the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not

supported. Which of the following is the most probable cause of the customer dissatisfaction?

A. The EMC storage specialist has not participated in the TDA meeting

B. The FC HBAs are 4 Gbps technology

C. The Technical and Delivery Assessment review actions were not executed

D. The customer should have checked that the HBAs are supported according to the HP storage

interoperability matrix

Correct Answer: C