All4Certs Exam Archive [PDF and VCE] Free Share HP0-081 PDF Exam Preparation Materials with CertBus Real Exam Questions

[PDF and VCE] Free Share HP0-081 PDF Exam Preparation Materials with CertBus Real Exam Questions

Categories :

Don’t worry about how to get yourself well prepared your HP0-081 exam! CertBus will work you out of your HP0-081 exam with the latest updated HP0-081 OpenVMS System Administration PDF and VCE dumps. CertBus provides the latest real HP HP0-081 exam preparation material, covering every aspect of HP0-081 exam curriculum.

We CertBus has our own expert team. They selected and published the latest HP0-081 preparation materials from HP Official Exam-Center: http://www.certgod.com/HP0-081.html

QUESTION NO: 18

A customer asks which bays they could install MultiSwitch Interconnect Module (MSIM). Which of

the following is the source of this information?

A. CDAT

B. IBM Systems Director

C. Tivoli Provisioning Manager (TPM)

D. BladeCenter Interoperability guide

Answer: D

QUESTION NO:103

A new Disaster Recovery site has been established using Metro Mirror to hold synchronous data at both

sites. After the Metro Mirror is started, one of the most important applications, a DB2 database, slows down.

An analysis shows that the I/O rate (especially write I/Os) is less than 40% compared to the former rates.

What is the best explanation for this behavior?

A. the bandwidth of the PPRC connection between the two sites is too small

ExamReal.com — 100% Real QandAs | 100% Real Pass

B. the DS8000 SFI at the remote site was shipped with slower disks

C. I/O rates vary, depending on the distance between the two sites and the rates cannot be changed

easily, due to latency

D. the DB2 database does not work with Metro Mirror without an additional license

Correct Answer: C

QUESTION NO: : 40

Which statement is true when planning to upgrade IBM Tivoli Access Manager for e-

business V6.0 components to IBM Tivoli Access Manager for e-business V6.1.1 and those

components coexist in the same server with an instance of IBM Tivoli Directory Server

V6.0?

A. It is not necessary to install or upgrade any IBM Tivoli Directory Server component.

B. It is necessary to upgrade only the IBM Tivoli Directory Server V6.0 client to level V6.1.

C. It is necessary to upgrade IBM Tivoli Directory Server V6.0 server and client to level

V6.1.

D. It is necessary to install only the IBM Tivoli Directory Server V6.1 client that can coexist

with IBM Tivoli Directory Server V6.0 server and client.

Answer: D

Explanation:

QUESTION NO: 162

An administrator would like to use system plans to clone the partition definitions of an existing Power 795

system to a new Power 795. Both systems have the same hardware configuration.

When the administrator attempts to deploy the system plan taken from the old system to the new one the

‘Deploy System Plan’ wizard fails at the hardware validation stage.

Which of the following actions would allow the administrator to deploy the system plan from the old system

to the new?

A. Select the ‘Ignore Hardware Validation’ option when deploying the System Plan.

B. Use the System Plan Conversion Wizard from the System Plans menu on the HMC.

C. Export the original sysplan with the ‘Allow Deployment On Remote System1 option.

D. Use the System Planning Tool (SPT) to validate and convert the original system plan for deployment.

Correct Answer: D

QUESTION NO: 37

At a minimum, what must be done before upgrading IBM Tivoli Storage Manager (TSM)?

Check for hardware requirements.

Check for the newest TSM fixes.

Perform a backup of the TSM environment including the database.

Update the BIOS of the TSM server.

A. 1, 2, 3

B. 2, 3, 4

C. 1, 3, 4

D. 1, 2, 4

Answer: A