Don’t worry about how to get yourself well prepared your HP2-E50 exam! CertBus will work you out of your HP2-E50 exam with the latest updated HP2-E50 Consultative Selling of HP Mission Critical Technical Services PDF and VCE dumps. CertBus provides the latest real HP HP2-E50 exam preparation material, covering every aspect of HP2-E50 exam curriculum.

We CertBus has our own expert team. They selected and published the latest HP2-E50 preparation materials from HP Official Exam-Center: http://www.certgod.com/HP2-E50.html

QUESTION NO:139

Before submitting a long form, an application needs to explicitly detect that the device is connected to the

Worklight server. How can this be done?

A. Add an event listener to WL.Events.WORKLIGHT_IS_CONNECTED and handle the submission of the

form in the callback.

B. Add an event listener to WL.Events.WORKLIGHT_IS_DISCONNECTED and handle the submission of

the form in the callback.

C. Use WL.Client.invokeProcedure() to a procedure and then handle the submission of the form in the

callback onSuccess.

D. Use WL.Device.getNetworkInfo() and handle the submission of the form in the callback after checking

that isNetworkConnected is true.

Correct Answer: C

QUESTION NO:63

Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an

HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?

A. Verify the ISV application runs on AIX 5.2

B. Power4 to POWER5 upgrades are not supported without a application recompile

C. Check the placement and size of the boot logical volume and disk space requirements on the

S85

D. AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked

Answer: A

QUESTION NO:17

Companycom is purchasing a p5 595 as part of a large server consolidation. They are planning

on using micropartitioning and Virtual IO to consolidate small machines. They used the rPerf

numbers for AIX 5.3 to size their solutions. They discovered that their application is not yet

certified on AIX 5.3, so they will have to use AIX 5.2. What changes should be made to their

configuration?

A. Increase memory

B. Add more adapters

C. Increase both processors and adapters

D. Increase the number of processors by 20 – 30%

Answer: C

QUESTION NO:116

Which statement describes a recognized security risk with programs that adopt authority?

A. Items in IFS directories can be altered.

B. The users job will retain elevated authority when the program ends.

C. If the program opens a command line, a user will have access to the system at elevated authority.

D. If the program calls another program, the called program cannot avoid running at elevated authority.

Correct Answer: C

QUESTION NO: 22

A solution implementer has created a multi-protocol gateway (MPGW) service to process

messages containing the MQRFH2 header. The MQ front side handler is configured to exclude

“MQRFH2” headers from the payload. How does the solution implementer configure the MPGW

service Header tab to send the request as an MQ message for the backend service?

A. Suppress “MQMD” header for the backend with a direction as “back”.

B. Suppress “MQRFH2” header for the backend with a direction as “back”.

C. Inject the header named “MQMD” with the value of

“MQSTR” for the backend with a direction as “back”.

D. Inject the header named “MQMD” with the value of

“MQSTR” for the backend with a direction as “front”.

Answer: C

Explanation: