All4Certs Exam Archive,Microsoft Archive [PDF and VCE] Free Share HP2-H13 PDF Exam Preparation Materials with CertBus Real Exam Questions

[PDF and VCE] Free Share HP2-H13 PDF Exam Preparation Materials with CertBus Real Exam Questions

Do not worry about that if you are stuck in the HP2-H13 exam difficulties, CertBus will assist you all your way through the HP2-H13 Selling HP Retail Point of Sale Solutions exam with the most update HP2-H13 PDF and VCE dumps. CertBus exam HP2-H13 preparation materials are the most comprehensive material, covering every key knowledge of HP2-H13 Selling HP Retail Point of Sale Solutions exam.

We CertBus has our own expert team. They selected and published the latest HP2-H13 preparation materials from HP Official Exam-Center: http://www.certgod.com/HP2-H13.html

QUESTION NO:129

An administrator needs to change the IP address used for the Operations Console LAN connection to the Power 720 50 that it resides on the main network.

What must the administrator do to complete this task?

A. Enable console takeover and recovery as the connection now goes through a network switch.

B. Access the control panel with function 65-21 and reset the console device discovery sequence.

C. Reset the console device ID, change the adapter address and recreate the Operations Console connection.

D. Reconfigure the connection in Operations Console with a new registered DNS name that points to the new IP address.

Correct Answer: C

QUESTION NO:44

A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their

Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the

sites. They utilize Tivoli Storage Manager for backups. They would like to replace a Microsoft Windows

server at the main site with a server at the DR site with a minimal amount of downtime. Which method will

achieve their goals?

A. locate the Tivoli Storage Manager data set for the server at the DR site, do a full backup, recover the

data to the DS6800, and make the data availableto the server B. create RMC relationships for all of the

data on the server to the DS6800, shut down the server, and make the data available to the new server

B.

shut down the server,create RMC relationships for all of the data on the server to the DS6800, and

make the data available to the new server

C.

recover the TSM backups to the DS6800 at the remote site, and make the data available to the new

ExamReal.com — 100% Real QandAs | 100% Real Pass

server

Correct Answer: B

QUESTION NO:66

The Business Partner technical specialist is planning the space requirements for a new IBM DS8000. The

service clearance requirements refer to the area required to .

A. open the service covers and pull components for maintenance

B. distribute the weight of the storage unit

C. place the storage unit

D.

allow the right airflow

Correct Answer: A

QUESTION NO:112

A customer has two DS8000 systems in their environment. One DS8000 has FlashCopy licensed while the

other does not. The customer wishes to license FlashCopy on the second DS8000. Which of the following

describes the TDA requirement in this situation?

A. a pre-sale TDA is mandatory

B. a pre-install TDA is mandatory

ExamReal.com — 100% Real QandAs | 100% Real Pass

C. a pre-install TDA is not mandatory since it is not FirstIn Customer Location (FICL)

D. both pre-sale and pre-install TDAs are mandatory

Correct Answer: C

QUESTION NO: 20

A fashion retailer would like to start taking pre-orders for an upcoming new line of merchandise.

Orders get stamped with the advertised release date of the merchandise. To prevent spurious

procurements from being triggered, the retailer wants the orders to be sourced only a few days

ahead of the inventory being available. Which option will address this requirement?

A. The orders should be put on a scheduling hold, and the hold released a few days before the

advertised product release date.

B. The scheduling rule can have a lead day of ‘X’ days configured so orders will be scheduled only

that many days ahead of the advertisedrelease date.

C. The scheduling rule can be configured to retry every ‘X’ hours so the orders will remain

backordered until the advertised release date of theproduct is reached.

D. The order can have an expected ship date way out in the future (like 1/1/2100) so the

scheduling agent will not pick up these orders. Theexpected ship date can then be changed a few

days before inventory becomes available.

Answer: B

Explanation: