As a leading IT exam study material provider, CertBus not only provides you the HP2-H04 exam questions and answers but also the most comprehensive knowledge of the whole HP2-H04 Selling HP Thin Client certifications. We provide our users with the most accurate HP2-H04 Selling HP Thin Client study material about the HP2-H04 exam and the guarantee of pass. We assist you to get well prepared for HP2-H04 certification which is regarded valuable the IT sector.

We CertBus has our own expert team. They selected and published the latest HP2-H04 preparation materials from HP Official Exam-Center: http://www.certgod.com/HP2-H04.html

QUESTION NO:33

A customer has a mission-critical application with redundant fabrics. The customer plans to replace older

EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller

(SVC). Which statement best describes the way to minimize the impact of data migration on the production

environment?

A. the production environment does not require an outage

B. the production environment requires an outage to install the SVC

C. the production environment requires an outage to install the DS8700

D. the production environment requires an outage to remove the EMC systems

Correct Answer: B

QUESTION NO: 206

In a large IBM Tivoli Storage Manager V6.2 environment there are many nodes with many

filespaces. Some of them should be exported to a remote system for disaster protection. The

names of the filespaces contain many special characters. What is the best way to resolve this

task?

A. Export all nodes data with a genericfilespace value.

B. Export / import node data server to server with thefsid= option.

C. Export / import node data server to server with all data from a specific node.

D. Restore nodes data to a work area and perform a backup to the remote system.

Answer: B

QUESTION NO:24

A customer would like to implement an IBM System Storage DS8000 solution that requires 225 TB raw

capacity. They are convinced that 450 GB is the optimum size for their business applications. There is

limited space available for additional machines in the data center. Which solution meets best this

requirement?

A. DS8700 system with three frames

B. DS8800 system with threeframe

C. DS8700 system with two frames

D. DS8800 system with two frames

Correct Answer: D

QUESTION NO:139

Before submitting a long form, an application needs to explicitly detect that the device is connected to

the Worklight server. How can this be done?

A. Add an event listener to WL.Events.WORKLIGHT_IS_CONNECTED and handle the submission of the

form in the callback.

B. Add an event listener to WL.Events.WORKLIGHT_IS_DISCONNECTED and handle the submission

of the form in the callback.

C. Use WL.Client.invokeProcedure() to a procedure and then handle the submission of the form in the

callback onSuccess.

D.

Use WL.Device.getNetworkInfo() and handle the submission of the form in the callback after checking

that isNetworkConnected is true.

Correct Answer: C

QUESTION NO:64

What is the meaning of the highest schedule priority (PTYLMT) parameter, when set to 0 on the CHGJOB JOBPTY(0) command?

A. A job is moved to the very top of the job queue

B. A system job is moved to the very top of the processor queue

C. A batch job is put in *HLD status while it is on a job queue

D. The job’s spooled files are moved to the very top of the output queue

Correct Answer: A