[PDF and VCE] Free CertBus Huawei HC-623-ENU PDF Real Exam Questions and Answers Free Download

As a leading IT exam study material provider, CertBus not only provides you the HC-623-ENU exam questions and answers but also the most comprehensive knowledge of the whole HC-623-ENU HCNP-CDPS(Constructing Data Protection System)-ENU certifications. We provide our users with the most accurate HC-623-ENU HCNP-CDPS(Constructing Data Protection System)-ENU study material about the HC-623-ENU exam and the guarantee of pass. We assist you to get well prepared for HC-623-ENU certification which is regarded valuable the IT sector.

We CertBus has our own expert team. They selected and published the latest HC-623-ENU preparation materials from Huawei Official Exam-Center: http://www.certbus.com/HC-623-ENU.html

QUESTION NO: 17

A company wants to inform the consumers of their services whether the DataPower processing

failed in the request or the response. They prefer to have generic error handling shared by all their

rules and thus have not defined any on-error actions on individual rules. From the default error rule

configured, the requirement is to inform the consumer whether the processing policy failed in the

request or the response. What extension function should the solution implementer use to

implement the requirement?

A. accepting()

B. requesting()

C. responding()

D. catch(rule-id)

Answer: C

Explanation:

QUESTION NO:73

A customer has a wide range of IBM enterprise disk systems and wants to manage copy services

functions. Which of the following products should the storage specialist recommend to this customer?

A. DS Hardware Management Console (HMC), because it manages ESS 800, DS6000, DS8000, and

SVC storage servers

B. Tivoli Storage Productivity Center for Data, because it manages ESS 800, DS6000, DS8000, and SVC

storage servers

C.

Tivoli Storage Productivity Center for Replication, because it manages ESS 800, DS6000, DS8000,

and SVC storage servers

D. External DS Hardware Management Console (HMC), because it manages ESS 800, DS6000, DS8000,

and SVC storage servers

Correct Answer: C

QUESTION NO:31

A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for

their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site

environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for

z/OS, and FlashCopy. 120 TB physical capacity is required per site. Only Fibre Channel drives can be

ExamReal.com — 100% Real QandAs | 100% Real Pass

used. Which solution best meets the specified requirements?

A. two DS8700 systems with two-way processor cards and 600 GB FC drives

B. two DS8700 systems with four-way processor cards and LPAR

C. two DS8700 systems with two-way processor cards and two frames per system

D. two DS8700 systems with four-way processor cards and two frames per system

Correct Answer: D

QUESTION NO: 10

Which network protocol does the “Ping Remote” DataPower function use to test network

connectivity to a remote system?

A. ARP

B. HTTP

C. ICMP

D. Multicast UDP

Answer: C

Explanation:

QUESTION NO:123

The following changes are made to a Worklight mobile application: 1.Web resources of version 1 (v1) are

updated and deployed to the Worklight Server. 2.A new version 2 (v2) is deployed with its updateSilently

property set to true. What will be the direct update user experience on a device running v1 of the

application when the user chooses to receive update?

A. v1 is uninstalled first followed by a silent installation of v2.

B. v1 web resources are updated first followed by a silent installation of v2.

C. v1 web resources are reloaded after the update and the application remains on v1.

D. The user is prompted to choose between updating v1 or installing v2 in the background.

Correct Answer: C