All4Certs Exam Archive Latest CertBus 4H0-100 Exam 4H0-100 Dumps 100% Free Download

Latest CertBus 4H0-100 Exam 4H0-100 Dumps 100% Free Download

Categories :

100% candidates have passed the 4H0-100 exam by the help of CertBus pass guaranteed 4H0-100 preparation materials. The CertBus Hyperion Solutions PDF and VCEs are the latest and cover every knowledge points of 4H0-100 Hyperion seebase bridge certification exam certifications. You can try the questions and answerss for an undeniable success in 4H0-100 exam.

We CertBus has our own expert team. They selected and published the latest 4H0-100 preparation materials from Hyperion Solutions Official Exam-Center: http://www.certgod.com/4H0-100.html

QUESTION NO:159

A tape cycle consists of 5 daily save tapes. After restoring a library from the Monday tape the administrator discovered that the library restored was from 2 weeks ago rather than last week.

Which action will allow the administrator to restore the correct version of the library in the future?

A. Modify the save procedure to initialize the tape prior to the save.

B. Use the OMITLIB parameter on the restore to omit the older versions of the library.

C. Use sequence number *LAST on the restore to restore the most recent version of the library.

D. Use the POSITION parameter on the restore to specify *LASTSAV restoring only the most recent version.

Correct Answer: A

QUESTION NO:147

An administrator is installing Worklight Server on a stand-alone machine in a QA environment and has

already performed the following steps: 1.Created and initialized the Worklight databases 2.Defined and

configured the required application server resources Which additional step must the administrator perform

to use the Worklight Console to verify successful installation?

A. Deploy the Worklight Console adapter file.

B. Install the Worklight sample customization WAR file.

C. Set the worklight.home JVM custom property to the location of the Worklight Console folder.

D. Copy the worklight-jee-library.jar file to the application server’s Worklight library folder.

Correct Answer: B

QUESTION NO:68

A healthcare customer has an IBM System i server and an HP-UX server. They have high performance I/

O, image-based, and archival applications. The customer has asked the IBM team for guidance on IBM

DS8000 disk technologies. Which DS8000 disk technology would provide the best performance without

regard to cost to meet the customer requirement?

A. 73 GB 15k and 300 GB 15k drives

B. 73 GB SSD and 2TB 7.2k drives

C.

146 GB 15k and 300 GB 15k drives

D.

146 GB 15k and 2TB 7.2k drives

Correct Answer: B

QUESTION NO: 171

An administrator is designing a new system for a currently existing OLTP (Online Transaction Processing)

application. It is heavily batch oriented and relies heavily on secondary storage. Which storage method

should be implemented in order to achieve the highest possible throughput?

A. VIO mapped SAN LUNs

B. NPIV attached SAN LUNs

C. VIO mapped Logical Volumes

D. Directly attached SAN LUNs

Correct Answer: D

QUESTION NO:155

The library LIBX contains a large number of files and the administrator needs to backup a physical file named WES and its associated logical files (named WFSOI through WES99). Using the SAVOBJ command, what is the most efficient procedure to backup the physical and logical files and ensure the quickest restore process?

A. Use the command SAVOBJ OBJ(WES) ACCPTH(*YES) to back up all the files at the same time.

B. Back up file LIBXM/FS.Run the SAVOBJ command again to backup the logical files and access paths.

C. Special generic name on the Objects parameter (WES*) to back up the all the files at the same time.

D. Back up files LIBX(WES* TYPE(*LF) and access paths.Run the SAVOBJ command again to backup the physical file LIBX/WFS.

Correct Answer: C