How to pass A2090-045 exam easily with less time? CertBus provides the most valid A2090-045 exam preparation material to boost your success rate in IBM A2090-045 IBM Information Management Level 1 Tools and Processes exam. If you are one of the successful candidates with CertBus A2090-045 PDF and VCEs, do not hesitate to share your reviews on our IBM materials.
We CertBus has our own expert team. They selected and published the latest A2090-045 preparation materials from IBM Official Exam-Center: http://www.certgod.com/A2090-045.html
QUESTION NO:134
An administrator notices the time stamp of service processor-related messages are significantly different
from other time stamps from events known to have occurred at the same time.
The system is HMC managed.
The HMC time zone shows the correct local time
IBM i shows the correct local time.
Where can the service processor time setting be verified?
A. In the QUTCOFFSET system value
B. In the ASMI date and time settings
C. In the Universal Time setting in System Service Tools
D. In the date and time setting for the managed system on the HMC Correct Answer: B
QUESTION NO:172
Which three components must be implemented when defining an authentication realm? (Choose three.)
A. Authenticator
B. Login module
C. Identity validator
ExamReal.com — 100% Real QandAs | 100% Real Pass
D. Challenge handler
E. Security certificate
F. Encryption module
G. Secure connection
Correct Answer: ABD
QUESTION NO: 181
A company has set up an environment with separate storage pools for backup and archive. There
is a storage hierarchy of tape and disk. The device class for the disk storage pool has the device
type of sequential file, so that deduplication can be used. If the storage pool on disk gets full, how
can the interruption of the backup process be prevented?
A. Increase the size of the disk storage pool.
B. Runthe migrate stg command in a specific interval so that the pool will always be emptied.
C. Runthe migrate stg interrupt=no command in a specific interval so that the pool will always be
emptied.
D. Adjust the high migration threshold so that automatic migration will be started early enough and
the backup process will not run ina out-of-space condition.
Answer: D
QUESTION NO:110
A customer is planning a combined solution of a 2 node SVC and DS8700 with 128×300 GB FC disks.
During the TDA the reviewer compares the machine configuration with the customer’s expectations. Which
of the following customer requirements must be considered?
A. the number of SAN ports required by the solution
B. thin provisioning is mandatory
C. the solution needs to support RAID 0
D. the solution needs to be supported by the VMware Site Recovery Manager
Correct Answer: A
QUESTION NO:5
When is it BEST to use validation in an XML application?
A. The application is being developed but not during production, when performance is more
important
B. The source of the XML data is untrusted
C. Validating stylesheets are used
D. High performance is an important architectural constraint
Answer: B