Tens of thousands of competitors, pages of hard questions and unsatisfied exam preparation situations… Do not worried about all those annoying things! We, CertBus, help you with your IBM 000-056 Rational BuildForge v7.1 exam. CertBus will assist you clear the 000-056 exam with 000-056 PDF and VCE questions. CertBus exam dumps are the most comprehensive ones.

We CertBus has our own expert team. They selected and published the latest 000-056 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-056.html

QUESTION NO:139

Before submitting a long form, an application needs to explicitly detect that the device is connected to

the Worklight server. How can this be done?

A. Add an event listener to WL.Events.WORKLIGHT_IS_CONNECTED and handle the submission of the

form in the callback.

B. Add an event listener to WL.Events.WORKLIGHT_IS_DISCONNECTED and handle the submission

of the form in the callback.

C. Use WL.Client.invokeProcedure() to a procedure and then handle the submission of the form in the

callback onSuccess.

D.

Use WL.Device.getNetworkInfo() and handle the submission of the form in the callback after checking

that isNetworkConnected is true.

Correct Answer: C

QUESTION NO: 177

A company wants to migrate an existing x86 Linux CRM and database environment from a large cluster of

servers to a Power 750 server. How can they perform this with minimal costs and rapid deployment?

A. Create virtual LPARs with Linux and migrate the applications, porting the x86 applications to Power.

B. Create virtual LPARs with Linux and migrate the applications to IBM Middleware for Linux.

C. Create virtual LPARs with Linux and install the applications using PowerVM Lx86.

D. Create virtual LPARs with Linux and install the applications using VMware.

Correct Answer: C

QUESTION NO: 54

A customer is looking at an Oracle eBusiness solution. They would like to know what hardware

they will need for the solution. They have some preliminary information from Oracle, including

hardware requirements and specifics for their environment. Which of the following should be done

next?

A. Configure a 2 node x3950 X5

B. Customer needs a System p server to support Oracle applications

C. Download the OracleeBusiness sizing questionnaire from IBM, fill out with customer and submit

to IBM for System x sizing

D. Configure a system that meets the minimum requirements

Answer: C

QUESTION NO:44

A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their

Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the

sites. They utilize Tivoli Storage Manager for backups. They would like to replace a Microsoft Windows

server at the main site with a server at the DR site with a minimal amount of downtime. Which method will

achieve their goals?

A. locate the Tivoli Storage Manager data set for the server at the DR site, do a full backup, recover the

data to the DS6800, and make the data availableto the server B. create RMC relationships for all of the

data on the server to the DS6800, shut down the server, and make the data available to the new server

B.

shut down the server,create RMC relationships for all of the data on the server to the DS6800, and

make the data available to the new server

C.

recover the TSM backups to the DS6800 at the remote site, and make the data available to the new

ExamReal.com — 100% Real QandAs | 100% Real Pass

server

Correct Answer: B

QUESTION NO:64

Two heterogeneous business partner applications interface with each other using XML data. The

binding contract for the structure of the data between the two applications is MOST likely to be:

A. WSDL.

B. UDDI.

C. XML Schema.

D. XML Information Set.

Answer: C