All4Certs Exam Archive Free Download the Most Update CertBus IBM 000-007 Brain Dumps

Free Download the Most Update CertBus IBM 000-007 Brain Dumps

Categories :

Don’t worry about how to get yourself well prepared your 000-007 exam! CertBus will work you out of your 000-007 exam with the latest updated 000-007 IBM Tivoli Netcool/OMNIbus V7.3 Implementation PDF and VCE dumps. CertBus provides the latest real IBM 000-007 exam preparation material, covering every aspect of 000-007 exam curriculum.

We CertBus has our own expert team. They selected and published the latest 000-007 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-007.html

QUESTION NO: 122

A customer has four LPARs: VIO1, VIO2, LPAR1 and LPAR2 VIO Servers (VIOS) are configured with SEA

adapter failover and 802.1Q is enabled on the LPARs.

During scheduled maintenance, VIO1 is brought down and the SEA failover happens automatically.

However, network traffic is not leaving the VIO for LPAR1.

The SEA interfaces are setup as follows:

VIO1 – SEA

PVIDs 55,60,65,70

VIO2 – SEA

PVIDs 45,60,65,75

The LPARs have their virtual network devices setup as follows:

LPAR1 – Adapter ID 55 – VLAN ID 75

LPAR2 – Adapter ID 60 – VLAN ID 45

What is the reason for the networking problem?

A. LPAR1 has the wrong VLAN ID configured.

B. VIO2 has the wrong VLAN IDs configured.

C. The LPARs have the wrong adapter IDs configured.

D. The LPARs and the VIO servers are on different subnets.

Correct Answer: B

QUESTION NO:117

An administrator with a single-partition POWER7 system needs to install new server firmware. How are server firmware updates delivered for POWERJ systems with update policy set to “OS managed”?

A. With a PTF using marker ID MHxxxxx

B. With a PTE using marker ID TRxxxxx

C. With a PTE using marker ID MFxxxxx

D. With a PTE using marker ID SIxxxxx

Correct Answer: A

QUESTION NO:15

Which activities occur during each playback iteration?

A. Design Solution, Build Solution, Test Solution, Deploy to Production Environment

B. Gather Requirements, Design Solution, Build Solution, Test Solution

C. Gather Requirements, Build Solution, Test Solution, Deploy to Production Environment

D. Gather Requirements, Design Solution, Build Solution, Deploy to Production Environment

Correct Answer: B

QUESTION NO: 13

Which of the follow statements MOST accurately describes the effect of increasing the JVM heap

size?

A. More objects will be created and the time required to garbage collect will decrease.

B. Applications run longer before a garbage collection occurs.

C. A larger heap size will cause the server to take loner to start.

D. No measurable performance change will result from increasing the heap size.

Answer: B

QUESTION NO: 22

A return order has been released and the return items are ready to be received. What is the first

step that needs to be taken on the Return Order in the Application Console to initiate the receiving

process?

A. Start Receipt

B. Record Receipt

C. Receive Receipt

D. Report/Record Receipt

Answer: A

Explanation: