CertBus IBM P9510-021 the Most Up to Date VCE And PDF Instant Download
CertBus ensures to provide the most update P9510-021 IBM Information Management Information Server Technical Sales Mastery Test v1 exam questions with the most accurate answers. CertBus P9510-021 are the most complete and authoritative exam preparation materials with which one can pass the P9510-021 exam in an easy way. Preparing for IBM P9510-021 IBM Information Management Information Server Technical Sales Mastery Test v1 exam is really a tough task to accomplish. But CertBus will simplified the process.
We CertBus has our own expert team. They selected and published the latest P9510-021 preparation materials from IBM Official Exam-Center: http://www.certgod.com/p9510-021.html
QUESTION NO: 20
A fashion retailer would like to start taking pre-orders for an upcoming new line of merchandise.
Orders get stamped with the advertised release date of the merchandise. To prevent spurious
procurements from being triggered, the retailer wants the orders to be sourced only a few days
ahead of the inventory being available. Which option will address this requirement?
A. The orders should be put on a scheduling hold, and the hold released a few days before the
advertised product release date.
B. The scheduling rule can have a lead day of ‘X’ days configured so orders will be scheduled only
that many days ahead of the advertisedrelease date.
C. The scheduling rule can be configured to retry every ‘X’ hours so the orders will remain
backordered until the advertised release date of theproduct is reached.
D. The order can have an expected ship date way out in the future (like 1/1/2100) so the
scheduling agent will not pick up these orders. Theexpected ship date can then be changed a few
days before inventory becomes available.
Answer: B
Explanation:
QUESTION NO: 65
There are multiple property files which control the behavior of the FFDC filter. All of the following
are FFDC property files EXCEPT:
A. ffdcStart.properties – used while the server is starting
B. ffdcRun.properties – used after the server is ready
C. ffdcException.properties – used whenever an exception occurs
D. ffdcStop.properties – used while the server is in the process of stopping
Answer: C
QUESTION NO:94
The DNS server was updated with the new IP address of a remote system. Whenever the administrator tries to connect to the remote system from the local system, they are unable to do so.
Which action will resolve this issue with the least disruption to the network?
A. Remove the host route for the old IP address.
B. Run the CHGTCPDMN command to clear DNS cache.
C. Clear the APP cache on the administrator’s PC.
D. Add a route with *NEXTHOP specified as the remote system name.
Correct Answer: B
QUESTION NO: 136
Which file stores all Backup-Archive client errors?
A. tsmba.log
B. baclient.log
C. dsmerror.log
D. tsmclient.log
Answer: C
QUESTION NO:20
An administrator has been asked to install the following PTF packages from DVD. SF99710 Cumulative PTF Package SF99627 Electronic Service Agent Group SF99707 Technology Refresh SF99708 Group Security SF99709 Group HIPER
Using Option 8 (Install Program Temporary Fix Package) on the GO PTF menu, how can the administrator install all of the above PTFs in the shortest possible time?
A. Install all packages as a multiple volume PTF set.
B. Install SF99710 Cumulative PTF Package as it contains all of the other PTFs.
C. Load and permanently apply the cumulative package followed by each of the group PTFs.
D. Install the Technology Refresh first, IPL, then install the remaining packages as a group.
Correct Answer: A
QUESTION NO: 55
The following exhibit shows a SAML version 1.1 assertion that is generated in the post-processing
step of an access control policy.
<saml:Assertion xmlns:saml=
QUESTION NO: 60
Compared to the backup strategy for a VIO Server, what additional element needs to be backed up in an
IVM deployment?
A. LPAR profile data
B. LHEA port allocation
C. Storage pool definitions
D. PowerVM Edition keys
Correct Answer: A
QUESTION NO:50
Best practices would have no single point of failure between mirrored resources. In setting up
virtual, internal boot disks for two client LPARs, how would this be accomplished?
A. Have one VIO server with striped disks for all LPARs
B. Have one VIO server with mirrored disks for all LPARs
C. Have two VIO servers with each LPAR accessing both VIO servers
D. Have two VIO servers with each LPAR accessing a different VIO server
Answer: C
QUESTION NO:62
Companycom is considering a large partitioned p5 590 to consolidate several smaller systems in
their data center. Due to the complexity of the consolidation, the customer is asking the technical
support specialist to give them a report which shows pre order PCI adapter placement and
validates them against IBM’s recommendations. The concern is that the factory will not install the
adapters in the appropriate slots as the customer pre-selected. What IBM tool is available to
provide this?
A. LPAR Validation Tool (LVT)
B. Personal Systems Configurator (PSC)
C. IBM Configuration for eBusiness (eConfig)
D. Advanced System Management Interface (ASMI)
Answer: A
QUESTION NO:26
A solution implementer needs to configure a front side handler in a multi-protocol gateway service
that only accepts messages from applications servers that are in the 10.10.10.0/24 subnet. What
can the solution implementer configure in a front side handler to restrict messages to the
10.10.10.0/24 subnet?
A. Specify a Local IP Address of 10.10.10.0/24
B. Specify a Port Number to a value in the ephemeral port range
C. Specify an Access Control List with an entry of “allow 10.10.10.0/24”
D. Specify a SSL Proxy Profile that requires a client side certificate signed by a trusted certificate
authority
Answer: C
Explanation: