Attention please! Here is the shortcut to pass your 00M-649 exam! Get yourself well prepared for the IBM 00M-649 IBM Rational Systems and Software Engineering Sales Mastery Test v2 exam is really a hard job. But don’t worry! We, CertBus, provides the most update exam PDF and VCEs. With CertBus latest exam questions and answerss, you’ll pass the 00M-649 IBM Rational Systems and Software Engineering Sales Mastery Test v2 exam in an easy way.

We CertBus has our own expert team. They selected and published the latest 00M-649 preparation materials from IBM Official Exam-Center: http://www.certgod.com/00M-649.html

QUESTION NO:3

The threshold limit has been reached for the system ASP on a system running IBM i 7.1 . There are some disk units configured to a user ASP available. Business continuing policy prevents the administrator from stopping the system.

How could the system administrator correct the storage problem in the system ASP?

A. Increase the ASP threshold above the currently utilized storage.

B. Concurrently remove available disk units from user ASP using the “Remove units from configuration” SST option and add them to system ASP.

C. Switch to the backup system using an HA solution and restart the original system to DST. Remove the available disk units from user ASP and add them to system ASP.

D. Initiate a control panel function 21 to activate DST on the system console for the affected partition. Use the DST feature to compress the parity stripe to increase available storage.

Correct Answer: B

QUESTION NO:47

Companycom is considering a partitioned solution which will require cumulative rPerf total of 150.

The original sizing came back recommending a 32-way p5 590. However, they have a

requirement for future scalability and availability is important. Which of the following would be the

best reason to recommend a p5 595?

A. The p5 595 would allow for COD

B. The p5 595 includes the Advanced Power Virtualization hardware and software

C. The p5 595 is priced the same as the p5 590 given the same number/type of CPUs

D. The p5 595 performance would be equivalent to the p5 590 given the same number/type of

CPUs

Answer: A

QUESTION NO:48

A system administrator had a disk failure on an HMC. The disk was replaced and the HMC was

loaded from the Product Recovery CD. The system administrator had performed a backup to

DVD of the HMC data before the system failed. After restoring the backup files, it was noticed that

no profile files were restored. What is the most likely cause of this problem?

A. The profile data was not initialized after restoring the backup CD

B. The profile data was not backed up before doing the Critical Console Data backup

C.A Critical Console Data backup was performed which backs up user data, but not profile data

D. A Save Upgrade data was done instead of a backup Critical Console Data and the profile files

were not included

Answer: B

QUESTION NO: : 38

Which two statements are true regarding a mutual authenticated Secure Socket Layer

junction? (Choose two.)

A. A junctioned back-end server must validate WebSEAL identity using a client certificate.

B. A junctioned back-end server can validate WebSEAL identity using a Basic

Authentication mechanism.

C. WebSEAL and junctioned back-end servers cannot use certificates signed by the same

Certificate Authority.

D. WebSEAL always validates the server certificate from the back-end server and the

certificate subject distinguished name.

E. WebSEAL always validates the server certificate from the back-end server and

optionally the certificate subject distinguished name.

Answer: B,E

Explanation:

QUESTION NO: 71

An administrator needs to add additional LPARs to a Power 770 server, but all of the available memory on

the system is currently assigned to existing LPARs and is continually utilized. What solution can the

administrator implement on the system to add the LPARs?

A. Active Memory Expansion

B. Active Memory Compression

C. Virtual Memory Management

D. Weighted Memory Allocation

Correct Answer: A