All4Certs Exam Archive Latest CertBus 000-533 Exam 000-533 Dumps 100% Free Download

Latest CertBus 000-533 Exam 000-533 Dumps 100% Free Download

Categories :

How to pass 000-533 exam easily with less time? CertBus provides the most valid 000-533 exam preparation material to boost your success rate in IBM 000-533 IBM Certified Application Developer – Informix 11.50 exam. If you are one of the successful candidates with CertBus 000-533 PDF and VCEs, do not hesitate to share your reviews on our IBM materials.

We CertBus has our own expert team. They selected and published the latest 000-533 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-533.html

QUESTION NO:164

An administrator is creating a new connection to an existing system, but cannot connect successfully. Which action will resolve the problem?

A. Create a user profile for the connection.

B. Delete, recreate, and test the connection.

C. Enable the user profile for the connection.

D. Change the connection to be the Management Central system. Correct Answer: B

QUESTION NO:39

The solution implementer needs to configure the DataPower appliance to restrict user account access to

specific domains. The solution implementer implements this requirement by configuring the Domain

Restriction section of the user account. During application execution, the configured user account is able to

access a domain that is configured as restricted (no access allowed by this user). What should the solution

implementer identify as a valid source of the problem?

A. An existing access policy or RBM policy can supersede the Domain Restriction list.

B. User access cannot be restricted to a specific domain in the user account configuration.

C. The user is a member of the ‘root’ user group.

D. The RBM system was not used to restrict access, which is the only way to meet the Domain Restriction

requirement.

Correct Answer: A

QUESTION NO:22

Companycom is purchasing a p5 590 which was configured with 60 Amp line cords. They have

just indicated that their large datacenter is already wired for 100 Amp power circuits in the

location where the server will be installed. What would be the recommended action?

A. Use the 60 Amp line cords

B. Change the 100 Amp connector to a 60 Amp circuit

C. Submit an RPQ to order the p5 590 with 100 Amp power cords

D. Change the configuration and order the p5 590 with the 100 Amp power cords

Answer: D

QUESTION NO: 37

A system administrator was asked to develop necessary artifacts to install a WebSphere

Application Server V6 Network Deployment package, create a deployment manager profile and a

customer profile, all on a single machine. Silent installation script response files were used. How

many response files does the system administrator need to create to accomplish this task without

using UI based tools?

A. 1

B. 2

C. 3

D. 4

Answer: C

QUESTION NO:79

A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery

site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup. Which factor

is a primary consideration when proposing a solution for this customer?

A. compatibility of copy functions

B. difference in capacities in the two systems

C. cache size discrepancies between the two systems

D. the necessity of using two storage management products

Correct Answer: A