All4Certs Exam Archive Free Download the Most Update CertBus IBM 000-238 Brain Dumps

Free Download the Most Update CertBus IBM 000-238 Brain Dumps

Categories :

How to pass 000-238 exam 100% without any difficulties? We, CertBus, provide the latest exam preparation material for the IBM 000-238 P5 and pseries technical sales support exam. Successful candidates share their experience about their 000-238 exam and the 000-238 exam preparation with CertBus exam questions and answerss. CertBus provides the new VCE and PDF dumps for the latest 000-238 exam. We ensure your 000-238 P5 and pseries technical sales support exam pass.

We CertBus has our own expert team. They selected and published the latest 000-238 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-238.html

QUESTION NO:42

A client needs to add a third Fiber Channel Adapter (HBA) to communicate with tape resources

on a Logical Partition (LPAR). An empty slot has previously been assigned to the partition. What

command would the administrator use to determine which slot is empty so that the hot-add tools

can be used?

A. lsslot -c pci

B. lsdev -Cc slot

C. lsattr -El adapter

D. lscfg -v |grep pci

Answer: A

QUESTION NO:47

An administrator needs to access an IBM i console remotely through the HMC. To which P address should the administrator telnet, using port 2300, to get console access?

A. To the IP address of the FSP

B. To the IP address of the HMC

C. Over SSH to the HMC and then select the 5250 option

D. To the Service Tools P address of the IBM i partition

Correct Answer: B

QUESTION NO:54

Companycom has been performing scheduled backups of their data to tape using “tar” in a script

for over one year with no problems. Recently, the tar command is returning a non zero return

code during the backup phase, causing the script to fail. What is the primary cause of this

problem?

A. The files have grown to over eight gigabytes in size

B. The file systems are corrupt, and fsck should be run

C. The tape block size has been changed from the default

D. The user’s limit has been changed to less than eight gigabytes

Answer: A

QUESTION NO:4

A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity.

What must be verified by the Business Partner during the visit to the computer room?

A. the space for the upgrade to a DS8700

B. the space on the left of the DS8000 for an expansion frame

C. the space on the right of the DS8000 for an expansion frame

D. the space to install additional DDMs in the base frame

Correct Answer: C

QUESTION NO:136

Programmers working on a software development project frequently need to save their development library (LIBX) at the prior release level of the operating system.

The administrator needs to change the default value of the SAVLIB command parameter to accommodate the programmers” prior release save requirement.

The default value before the change was: SAVLIB LIB(LIBX) TGTRLS(*CURRENT) The default value after the change will be: SAVLIB LIB(LIBX) TGTRLS(*PRV)

What should the administrator do to facilitate the change?

A. Adjust the system value QFRCCVNRST (Force conversion on restore) to *PRV.

B. Use the Change Command Default (CHGCMDDFT) command to change the TGTRLS parameter value to *PRV.

C. Use the Save Restore Configuration (SAVRSTCFG) command to change the TGTRLS parameter value to *PRV.

D. Use the command WRKREGINF to modify the exit point program QIBM_SAV_SECURITY and change the TGTRLS parameter value to *PRV.

Correct Answer: B