All4Certs Exam Archive Free Sharing CertBus Updated IBM C2090-730 VCE and PDF Exam Practice Materials

Free Sharing CertBus Updated IBM C2090-730 VCE and PDF Exam Practice Materials

Categories :

CertBus provides the most up to date and accurate preparing materials of the C2090-730 certification exam questions and answers , testing software, exam PDF and VCE files to help you prepare your C2090-730 DB2 9 Family Fundamentals exam. What training you are looking for? Come to visit our site and choose CertBus online certification materials, you will get a quick and cost-efficient way to become a IBM certified professional in IT industry.

We CertBus has our own expert team. They selected and published the latest C2090-730 preparation materials from IBM Official Exam-Center: http://www.certgod.com/C2090-730.html

QUESTION NO:135

A POWER7 customer using disk adapters with RAID-5 and hot spare has noticed sudden and significant performance problems with an LPAR. WRKDSKSTS followed by Fl 1 shows the disk units as “DEGRADED”. The customer has attempted to check the RAID card battery in Service Tools but it is not listed. What is the cause of the degraded status?

A. One of the power supplies in the disk drawer has failed.

B. The cache battery is in the 90-day replacement warning state.

C. The pairing of the RAID cards is broken, so the RAID cache is not in use.

D. The hot spare has taken over for a failed drive and is awaiting replacement.

Correct Answer: C

QUESTION NO: 180

A Linux LPAR has been created and RHEL6 has been installed. The LPAR has the following

characteristics:

Processor Entitlement – minimum / desired / maximum

1.0 2.0 3.0

A DLPAR operation to add 1 processor entitlement fails. Which of the followings actions will resolve this

issue?

A. Upgrade to PowerVM Standard Edition.

B. Set /proc/sys/kernel/rsct_dlpar to 1.

C. Reboot the Linux LPAR and use the 64bit kernel

D. Install the IBM Installation Toolkit for Linux.

Correct Answer: D

QUESTION NO:45

A storage specialist needs to automate some tasks triggered in the event of disaster recovery. What is the

best solution to accomplish this?

A.

using the DS GUI, step through Real Time Manager, Copy Services, Create custom scripts; actions

and event conditions can be defined that triggerthe script; there is no need for a password

B.

create a shell script usingdscli commands; trigger the script from the operating system, and call the

script using the -pwd option with the password

C.

create a password file; create a shell script using dscli commands; trigger the script from the operating

system

D.

create a password file; create a shell script usingdscli commands; trigger the script from the operating

system; call the dscli script with the dscli -script -pwdfile command

Correct Answer: C

QUESTION NO: 81

An administrator plans to implement Active Memory Expansion on several LPARs on a Power 770 system.

Which tool should be used to determine the recommended LPAR settings for Active Memory Expansion?

A. amepat

B. amelpar

C. amemon

D. amestat

Correct Answer: A

QUESTION NO: 17

A System x client is interested in IBM ToolsCenter Bootable Media Creator but is concerned about

functions. Which of the following describes the functions of ToolsCenter Bootable Media ?

A. Update Firmware, Update Drivers, Run Diagnostics, Install Windows

B. Update Firmware, Run Diagnostics, Install Windows, and Linux Operating Systems

C. Update Firmware, Run Diagnostics, Install Windows

D. Update Firmware, Update Drivers, Install Windows

Answer: C