How to pass CCFP-US exam 100% without any difficulties? We, CertBus, provide the latest exam preparation material for the ISC CCFP-US Certified Cyber Forensics Professional – United States exam. Successful candidates share their experience about their CCFP-US exam and the CCFP-US exam preparation with CertBus exam questions and answerss. CertBus provides the new VCE and PDF dumps for the latest CCFP-US exam. We ensure your CCFP-US Certified Cyber Forensics Professional – United States exam pass.

We CertBus has our own expert team. They selected and published the latest CCFP-US preparation materials from ISC Official Exam-Center: http://www.certgod.com/CCFP-US.html

QUESTION NO:161

A developer is using a Worklight Studio installation that is configured with the Android 2.2 SDK and the

corresponding Google USB driver. The developer has connected an Android device to the machine via a

USB cable. The developer tries to run the application on the device but does not see the device listed as a

target. What can be a cause for this issue?

A. Worklight does not support testing on Android 2.2 devices.

B. Installed Google USB driver is deprecated and must be explicitly enabled.

C. Installed Google USB driver does not support the device connected to the machine.

D.

The worklight.properties file of the application is not configured to allow USB connection.

Correct Answer: C

QUESTION NO:43

During a disaster recovery test the restore job abnormally ended. The administrator discovered that 95 of the 200 libraries on the system were restored, including the main database libraries. The remaining libraries represent less than 10% of the system.

Which sequence of actions will complete the restore in the minimum amount of time?

A. Restart the restore with the RSTLIB *NONSYS command with the restore option of *NEW to only restore those libraries not already restored.Then continue with the remaining restores DLO, IFS etc

B. Review the job log of the failed restore to determine why the restore failedRestart the restore with the RSTLIB *NONSYS command with a resume point of *LSTRST Then continue with the remaining restores DLO, IFS etc

C. Review the job log of the failed restore to determine the point at which the restore failedPerform a clear library for all the user librariesRestart the restore using the RSTLIB’NONSYS commandThen continue with the remaining restores DLO, IFS etc

D. Review the job log of the failed restore to determine the point at which the restore failedIdentify the library that was partially restoredClear the library that was partially restoredResume the restore using the RSTLIB *NONSYS command and specify the starting libraryThen continue with the remaining restores DLO, IFS etc

Correct Answer: D

QUESTION NO: 50

During the validation of a planned partition migration between managed servers, the following error

message is displayed:HSCLA297 The DLPAR Resource Manager (DRM) capability bits 0x0 for mover

service partition (MSP) VIOS indicate that partition mobility functions are not supported on the partition.

What is the most likely cause of this error?

A. An RMC error has occurred on one of the VIOS partitions.

B. The mobile partition has an HEA logical port configured.

C. There is a mismatch in VIO Server versions between the two systems.

D. The network connection to the mobile partition is not working.

Correct Answer: A

QUESTION NO:56

A customer wants to purchase an IBM System Storage DS8700 to support a high-performance database

environment. Which technical solution gives the customer the best relationship between I/O performance

at the machine’s backend vs. capacity installed in the machine?

A. additional installation of the first and second expansion frame will increase the backend performance

capability

B. the usage of 300 GB/15k FC disks will give the server a high-performance backend capability

C. performance Accelerator restricts the number of disks connected to one device adapter pair to 32 disks

D. the second RIO-G loop between the base frame and the first expansion increases the backend

performance

Correct Answer: C

QUESTION NO:5

Companycom has seven days of vmstat data on four p5 590 production LPARs of four

processors each. The data shows that all four LPARs have periodic utilizations of 90-95% lasting

several minutes in duration. However, the average utilizations of the four LPARs were between

15-30%. The vmstat data shows that the peak utilizations of each LPAR do not occur at the same

time. Which of the following should be set up?

A. A shared pool with four capped LPARs

B. A shared pool with four uncapped LPARs

C. Four dedicated LPARs and use DLPAR to manage resources effectively

D. The server in SMP mode and use WLM to manage resources effectively

Answer: B