One of my colleague recommend me that CertBus 70-441GB2312 dumps are effective and helpful. Thank goodness I followed up with him and choose CertBus as my assistance on my 70-441GB2312 Designing Database Solutions by Using MS SQL Serv 2005 certification exam! I passed my Microsoft 70-441GB2312 exam very easily. I was lucky, all my questions in the exams were from my Microsoft 70-441GB2312 dumps.

We CertBus has our own expert team. They selected and published the latest 70-441GB2312 preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/70-441GB2312.html

QUESTION NO:17

An administrator wants to ensure a job on the scheduler is ignored if the system is in a restricted state at the time it is scheduled to run. What change will make this occur?

A. Change the recovery action of the job schedule entry to *NOSBM.

B. Change the user profile on the job schedule entry to QRECOVERY.

C. Change the frequency option of the job schedule entry to *ACTIVE.

D. Use the option on the WRKJQBSCDE screen for “hold when restricted.”

Correct Answer: A

QUESTION NO: 180

When performing a command line full database backup, which two parameters are required?

(Choose two.)

A. TYPE

B. WAIT

C. SCRATCH

D. DEVCLASS

E. VOLUMENAMES

Answer: A,D

QUESTION NO: 179

As a result of an acquisition, an administrator is planning to consolidate some single-LPAR POWER6 520

servers onto an existing POWER7 server.

The administrator is attempting to make these 520 systems HMC-managed.

The network connection between the 520 system and an existing operational HMC have been verified and

checked. However the POWER6 machines fail to appear on the HMC panels.

What is the most likely resolution for this issue?

A. The POWER6 boxes need to be reset back to factory defaults.

B. The Flexible Service Processor (FSP) needs to be reset on each POWER6 520.

C. Upgrade to either PowerVM Standard or Enterprise edition.

D. Power cycle the physical system.

Correct Answer: B

QUESTION NO:115

An administrator is connecting to the HMC for IBM i console access using IBM i Access Using port 2300. What is the required user ID in “Connection Properties”?

A. Q#HMC

B. hscroot

C. QSECOFR

D. QCONSOLE

Correct Answer: A

QUESTION NO:81

Which of the following statements are true about SOAP 1.1?

A. It is an object-based protocol like IIOP.

B. It can be implemented over SMTP.

C. It can be implemented over HTTP.

D. It cannot be used through firewalls.

E. It allows for both RPC-based and message-oriented communications.

Answer: B, C, E