All4Certs Exam Archive,Microsoft Archive,Oracle Archive [Latest Version] Free CertBus Microsoft MB7-255 PDF Download with 100% Pass Guarantee

[Latest Version] Free CertBus Microsoft MB7-255 PDF Download with 100% Pass Guarantee

How to pass MB7-255 exam easily with less time? CertBus provides the most valid MB7-255 exam preparation material to boost your success rate in Microsoft MB7-255 Navision 4.0 Costing exam. If you are one of the successful candidates with CertBus MB7-255 PDF and VCEs, do not hesitate to share your reviews on our Microsoft materials.

We CertBus has our own expert team. They selected and published the latest MB7-255 preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/MB7-255.html

QUESTION NO:140

An HTTP adapter is deployed on a Worklight server. Which steps need to be taken by the developer to

receive data from the adapter in an application?

A. Create an invocationData object that contains the adapter and procedure names and send it through

the WL.Server.invokeProcedureAPI with the onSuccess and onFailure callbacks.

B. Create an invocationData object that contains the adapter and procedure names and send it through

the WL.Client.invokeProcedureAPI with the onSuccess and onTimeout callbacks.

C.

Create an invocationData object that contains the adapter and procedure names and send it through

the WL.Client.invokeProcedureAPI with the onSuccess and onFailure callbacks.

D.

Create an invocationData object that contains the backend URL and procedure name and send it

through theWL.Client.invokeProcedure API with the onSuccess and onTimeout callbacks.

Correct Answer: C

QUESTION NO:50

Best practices would have no single point of failure between mirrored resources. In setting up

virtual, internal boot disks for two client LPARs, how would this be accomplished?

A. Have one VIO server with striped disks for all LPARs

B. Have one VIO server with mirrored disks for all LPARs

C. Have two VIO servers with each LPAR accessing both VIO servers

D. Have two VIO servers with each LPAR accessing a different VIO server

Answer: C

QUESTION NO:162

A Worklight application does not need to connect to a server on startup. However, when previewing the

application on the device emulator, it is throwing a server connection error on start up. What is the

consequence if the connection error is resolved using the WL.Client.init({connectOnStartup:false}) API to

disable the connection to the server on application startup?

A. The application will not be able to subsequently connect to the server.

B. Server features other than the Remote Disable or Direct Update will be disabled.

C.

Any server features the application uses will only be available when it connects to the server.

D.

There will be no potential consequences as the runtime will safely disable server connectivity errors.

Correct Answer: C

QUESTION NO: 48

IBM Rational Performance Tester supports WS-Security implementation in which four application

servers? (Choose four.)

A. IBM WebSphere 5.0

B. IBM WebSphere 6.1

C. Microsoft Windows Communication Foundation 3.0

D. Apache AXIS2 1.51 with Rampart

E. Oracle Glassfish Server 2.1.1 with Metro

F. BEA Web Logic Application Server 8.1

Answer: B,C,D,E

QUESTION NO:157

An administrator needs to see the system assigned job number and percent of processing unit time attributed to all jobs currently running.

Which steps should the administrator take to accomplish this?

A. WRKJOB JOB(t), option 3 to display job run attributes

B. WRKACTJOB and press P11 two times to Display Thread Data

C. WRKSYSACT INFTYPF(*JOBS) and press PIO to update the list

D. WRKSYSSTS and press P19 to display Extended System Status

Correct Answer: B