Tens of thousands of competitors, pages of hard questions and unsatisfied exam preparation situations… Do not worried about all those annoying things! We, CertBus, help you with your Microsoft 074-674 Delivering Business Value Planning Services. exam. CertBus will assist you clear the 074-674 exam with 074-674 PDF and VCE questions. CertBus exam dumps are the most comprehensive ones.
We CertBus has our own expert team. They selected and published the latest 074-674 preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/074-674.html
QUESTION NO: : 59
What is the correct Access Control List (ACL) entry for the sales-admin ACL to allow users
in the administrator group to perform these tasks?
A. group admin TNdv
B. group admin TmW
C. group sales-admin TNdv
D. group sales-admin Tabc
Answer: A
Explanation:
QUESTION NO:22
During the load test of a routing application many queue depth high events are generated for the
ROUTING_Q which holds the applications input messages. Which of the following is the simplest change
that would reduce the number of queue high depth events? Increase the:
A. MAXMSG attribute on the ROUTING_Q queue
B. MAXDEPTH attribute on the ROUTING_Q queue
C. MAXMSG attribute on the SYSTEM.DEFAULT.LOCAL.QUEUE and recreate the ROUTING_Q queue
D. MAXDEPTH attribute on the SYSTEM.DEFAULT.LOCAL.QUEUE and recreate the ROUTING_Q
queue
Correct Answer: B
Explanation
Explanation/Reference:
QUESTION NO: 68
The ODBC stage can handle which two SQL Server data types? (Choose two.)
A. Date
B. Time
C. GUID
D. Datetime
E. SmallDateTime
Answer: C,E
Explanation:
QUESTION NO:39
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC
storage infrastructure. The customer dissatisfaction has arisen during the installation because according to
the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not
supported. Which of the following is the most probable cause of the customer dissatisfaction?
A. The EMC storage specialist has not participated in the TDA meeting
B. The FC HBAs are 4 Gbps technology
C. The Technical and Delivery Assessment review actions were not executed
D. The customer should have checked that the HBAs are supported according to the HP storage
interoperability matrix
Correct Answer: C
ExamReal.com — 100% Real QandAs | 100% Real Pass
QUESTION NO:38
A solution designer is using the DEFPSIST attribute on the queue definition to determine message
persistence. Queue Manager QMA has a QREMOTE queue defined that points to a QALIAS definition on
Queue Manager QMB, which in turn names a QLOCAL queue as its TARGET. If an application puts a
message to the QREMOTE on Queue Manager QMA, which of the queue definitions will control the
persistence of the message?
A. The QREMOTE on QMA
B. The transmission queue on QMA
C. The QLOCAL on QMB
D. All four of the queue definitions (QREMOTE, Transmission queue, QALIAS, QLOCAL)
Correct Answer: A
QUESTION NO: 104
You are editing the configuration file. Which statement is true about file system efficiency?
A. Using multiple scratch spaces in a logical node improves performance.
B. For the resource disk, it is best to use the partition where the engine is installed.
C. Creating scratch disk spaces on an internal disk rather than on an NFS drive improves sort
performance.
D. In a clustered environment where NAS is used for a common storage, you must specify the
internal disk for scratch disk.
Answer: C
Explanation:
QUESTION NO: 73
In IBM Sterling Selling and Fulfillment Suite, what is the only Supply Type that is considered for
Inventory Audits?
A. WIP
B. ONHAND
C. INTRANSIT
D. RESERVED
Answer: B
Explanation:
QUESTION NO: 23
A system administrator is reviewing a checklist of actions that should occur during the federation
process. The system administrator notes that all of the following checklist actions are correct
EXCEPT:
A. The node is added to the cell
B. The node agent and application server are started
C. The application server becomes a managed server in the cell
D. The application server is stopped, and a new node agent is created.
Answer: B
QUESTION NO:14
Which two actions are available when editing a message handler? (Choose two.)
A. Abort job
B. Demote to warning
C. Suppress from job log
D. Demote to informational
E. Suppress from the project
Answer: C,D
Explanation:
QUESTION NO:142
A system with IBM i 7.1 has at least one lPv6 address configured. When a user tries to ping a remote system by name, the response takes a long time. Ping by IP address (for example 10.x.x.x) works without delay.
Which action will fix this problem?
A. Use the command CHGTCPDMN and set the parameter HOSTSCHPTY to *LOCAL.
B. Use the command CHGTCPDMN and set the parameter HOSTSCHPTY to *REMOTE.
C. Update the Host Table Entries and add a IPv4 for that remote system name.
D. Change the ping command default as follows: CHGCMDDFT CMD(PING) NEWDFT(ADRVERFMT (*IP4))
Correct Answer: D