Do not worry about that if you are stuck in the MB3-528 exam difficulties, CertBus will assist you all your way through the MB3-528 GP 10.0 Financials exam with the most update MB3-528 PDF and VCE dumps. CertBus exam MB3-528 preparation materials are the most comprehensive material, covering every key knowledge of MB3-528 GP 10.0 Financials exam.

We CertBus has our own expert team. They selected and published the latest MB3-528 preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/MB3-528.html

QUESTION NO: 59

Due to a defect in the pricing logic, orders coming from the website are observed to be out of

balance, wherein the sum of the order line totals is more than the tender collected from the

customer. In order to handle this, the business team wants Sterling to automatically add an

adjustment to the order header to account for the difference at the time of order creation. What is

the simplest way of achieving this requirement?

A. Since the order total will be computed by the product automatically, the only way to solve this is

by adjusting the tender on the order.

B. The onOrderCreate event of the createOrder API can be used to perform the computation, and

the adjustment can be added by using the changeOrder API.

C. All orders can be put on a hold and the hold processing agent can be used to inspect orders for

out of balance and add the adjustment by using the adjustOrder API.

D. The beforeCreateOrderUE can be used to check for the difference between the order total and

tender on the order, and an adjustment for the delta returned in the output of the User Exit.

Answer: D

Explanation:

QUESTION NO:28

An multi-protocol gateway (MPGW) service is created to process a request message containing values for

the MQMD.ReplyQ and MQMD.ReplyToQMgr that are not configured in the MPGW service. The back end

service sends a SOAP message as response to the MPGW service that needs to be routed to the

originating client using MQ Object Descriptor (MQOD) method. How can the solution implementer

accomplish this requirement using the configured MPGW service?

A. Using Header Tab, inject service virtual headers named “ReplyToQ” and “ReplyToQM” with the value

of an empty string for the front end with a direction as “front”

B. Using Header Tab, inject service virtual headers named “ReplyToQ” and “ReplyToQM” with the value

of an empty string for the back end with a direction as “back”

C. Using XSLT, inject service virtual headers named “ReplyToQ” and “ReplyToQM” with the value of an

empty string in the response rule as shown below:

D. Using XSLT, inject service virtual headers named “ReplyToQ” and “ReplyToQM” with the value of an

empty string in the request rule as shown below:

Correct Answer: C

QUESTION NO:118

A client has bought an IBM System Storage DS8000 and needs to attach a Sun Solaris Host with 2 HBAs

via one fabric to 4 I/O ports on the DS8000. The client needs redundant paths to the volumes on the

DS8000. What is the maximum number of volumes that can be used on the Solaris host?

A. 256

B. 512

C. 1024

D. 2048

Correct Answer: C

QUESTION NO:65

A customer’s new IBM System Storage DS8000 must be raised by two floors in the building to place it in

the computer room. In order to simplify the physical delivery, the storage specialist asks for .

A.

a quotation for extra delivery services

B. the addition to the configuration of the feature “Shipping weight reduction” at no charge

C.

an order of the DS8000 with the minimum number of drive sets allowed and an MES order for the

remaining drive sets needed

D.

an RPQ order to receive frames and drive sets separately

Correct Answer: B

QUESTION NO:134

An administrator notices the time stamp of service processor-related messages are significantly different

from other time stamps from events known to have occurred at the same time.

The system is HMC managed.

The HMC time zone shows the correct local time

IBM i shows the correct local time.

Where can the service processor time setting be verified?

A. In the QUTCOFFSET system value

B. In the ASMI date and time settings

C. In the Universal Time setting in System Service Tools

D. In the date and time setting for the managed system on the HMC Correct Answer: B