Free Download the Most Update CertBus Nortel 920-360 Brain Dumps
100% candidates have passed the 920-360 exam by the help of CertBus pass guaranteed 920-360 preparation materials. The CertBus Nortel PDF and VCEs are the latest and cover every knowledge points of 920-360 Communication Server 1000 Rls. 6.0 Engineering and Network Des certifications. You can try the questions and answerss for an undeniable success in 920-360 exam.
We CertBus has our own expert team. They selected and published the latest 920-360 preparation materials from Nortel Official Exam-Center: http://www.certgod.com/920-360.html
QUESTION NO:47
An administrator needs to access an IBM i console remotely through the HMC. To which P address should the administrator telnet, using port 2300, to get console access?
A. To the IP address of the FSP
B. To the IP address of the HMC
C. Over SSH to the HMC and then select the 5250 option
D. To the Service Tools P address of the IBM i partition
Correct Answer: B
QUESTION NO: : 66
Which IBM Tivoli Access Manager WebSEAL component gathers information about the
junction mapping table?
A. pdweb.jmt
B. pdweb.vhj.#
C. pdweb.jct.#
D. pdweb.threads
Answer: A
Explanation:
QUESTION NO: 25
A solution implementer is configuring a single multi-protocol gateway to dynamically route
messages to back end servers. For internal consumers the request needs to be routed to an MQ
based back end and for external consumers the request needs to be routed to an HTTP based
back end service. How can the solution implementer satisfy this requirement?
A. Use the xset-target extension function.
B. Select a route action with an XPath routing map.
C. Set the variable var://service/routing-url.
D. Set the variables var://service/URI for the server and var://service/protocol-method for the
protocol type.
Answer: C
Explanation:
QUESTION NO:96
A customer has purchased three IBM System Storage DS8700 systems and would like to have their
administrators trained. Which training alternative provides the necessary training with the least financial
impact?
A. purchase the training CD for the disk subsystem and have the staff do self-paced training
B. have the IBM Service Support Representative perform the training
C. contact IBM Education Services for an onsite training class
D. send one person at a time to an IBM training session
Correct Answer: C
QUESTION NO:106
Which of the following XSL FO elements represent block level elements?
A. fo:block
B. fo:flow
C. fo:table
D. fo:table-and-caption
E. fo:page-sequence
Answer: A, C, D
QUESTION NO: 139
Certain configurations of Power 770 and Power 780 servers can be ordered with multiple IVE adapters.
When designing a configuration to provide improved network availability what fact should be observed as a
risk?
A. 1Gbps and 10Gbps adapters may not be aggregated into a single logical link.
B. The same model of IVE must be ordered for each building block.
C. IVE adapters do not support hot-plug operations.
D. An EtherChannel device created from adjacent IVE ports can result in broadcast storms.
Correct Answer: C
QUESTION NO:141
A developer writes a Worklight push notification application and creates the following: 1.An event source
2.An adapter to retrieve the notification from the event source 3.A function to notify the user device 4.A
function to handle the arriving notification Which two actions still need to be done? (Choose two.)
A. Deploy the adapter to the server.
B. Deploy the event source to the server.
C.
Create a function to verify the user device.
D. Create a function to subscribe to the event source.
E. Register the event source for the device on the console.
Correct Answer: AD
QUESTION NO: 72
A Resource pool defines two slots, 9-12 and 1-5, and the available capacity is four hours in each
slot. The following capacity reservations are to be made:
In IBM Sterling Selling and Fulfillment Suite, which capacity reservations will be created?
A. Res1
B. Res2
C. Res3
D. Res4
Answer: A
Explanation:
QUESTION NO:75
A customer has multiple applications on multiple open platforms in their current environment based on IBM
System Storage DS8100. They plan to set up a business continuity solution that meets the objective of
zero or little data loss for their business critical data. The customer has indicated that cost is a factor.
What should the storage specialist recommend?
A.
a DS8700 in the Business Continuity site with a Metro Mirror license
B.
a DS8700 with SAN Volume Controller in the Business Continuity site
C. a DS8700 in the Business Continuity site with Global Copy license
D. two new DS5300 servers (production and Business Continuity site) with a Global Copy license
Correct Answer: A
QUESTION NO:149
A developer needs to call a Java class that is packaged in a JAR file from an adapter. Where should this
JAR file be placed in the project’s folder structure?
A. server/java
B. server/lib
C. adapters/java
D. adapters/lib
Correct Answer: B