Do not worry about that if you are stuck in the 1Z0-883 exam difficulties, CertBus will assist you all your way through the 1Z0-883 MySQL 5.6 Database Administrator exam with the most update 1Z0-883 PDF and VCE dumps. CertBus exam 1Z0-883 preparation materials are the most comprehensive material, covering every key knowledge of 1Z0-883 MySQL 5.6 Database Administrator exam.

We CertBus has our own expert team. They selected and published the latest 1Z0-883 preparation materials from Oracle Official Exam-Center: http://www.certgod.com/1z0-883.html

QUESTION NO:35

Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a

training LPAR to the system, but no processors are available. All of the partitions are using

dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What

can be done to setup this training LPAR quickly without disabling their current environment?

A. Use AIX 5.3 which supports micro-partitioning for both the test and training LPARS

B. Use DLPAR to move resources from the test LPAR to training when training is active

C. Install Partition Load Manager to share resources between the test and training environments

D. Install Advanced Power Virtualization and then use micro-partitioning for both the test and

training LPARs

Answer: D

QUESTION NO:66

Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1

CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre

Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR

4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day

period LPAR 1: Average utilization was

15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100%

LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was

35%, Peak utilization was 100% If the customer has a requirement for all four LPARs moved to a

p5 590 and to have dedicated CPU resources, which of the following would best describe the

profile requirements?

A. LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT

on, min CPU 1.0, max CPU 3.0, desired CPU 2.0

B. LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT

on, min CPU 2.0, max CPU 3.0, desired CPU 3.0

C. LPARs 1 and 2, SMT on, min CPU 1.0, max CPU 3.0, desired CPU 3.0 LPARs 3 and 4, SMT

on, min CPU 1.0, max CPU 3.0, desired CPU 2.0

D. LPARs 1 and 2, SMT off, min CPU 1.0, max CPU 1.0, desired CPU 1.0 LPARs 3 and 4, SMT

off, min CPU 1.0, max CPU 3.0, desired CPU 3.0

Answer: B

QUESTION NO:51

A client has bought an IBM System Storage DS8000 and needs to attach a Sun Solaris Host with 2 HBAs

via one fabric to 4 I/O ports on the DS8000. The client needs redundant paths to the volumes on the

DS8000. What is the maximum number of volumes that can be used on the Solaris host?

A. 256

B. 512

C. 1024

D. 2048

Correct Answer: C

QUESTION NO: 51

A problem has been reported to a system administrator, however the system administrator is

unable to use the Log Analyzer for some reason. Which of the following is an alternative way for

the system administrator to review the Log Analyzer log file?

A. Use the dumplog command.

B. Use the showin command

C. Use any text editor although the formatting wont be as nice.

D. Format the Log Analyzer log with wsadmin and then use any text editor.

Answer: B

QUESTION NO:30

A customer has an IBM System Storage DS8700 and wants to reach the highest possible throughput in the

back-end for a storage-pool-striped volume out of an extent pool with 8 ranks. Over how many device

adapter pairs should a technical specialist spread the workload?

A. 2

B. 4

C. 6

D. 8