All4Certs Exam Archive Latest CertBus ST0-096 Exam ST0-096 Dumps 100% Free Download

Latest CertBus ST0-096 Exam ST0-096 Dumps 100% Free Download

Categories :

There is no need to worry when you are suffering the difficult time in the ST0-096 exam preparation, CertBus will assist you to pass the ST0-096 exam with latest update ST0-096 Symantec Backup Exec 2010(STS) PDF and VCE dumps. CertBus has the most comprehensive Symantec exam preparation materials, covering each and every aspect of ST0-096 Symantec Backup Exec 2010(STS) exam curriculum. We ensure you 100% success in ST0-096 exam.

We CertBus has our own expert team. They selected and published the latest ST0-096 preparation materials from Symantec Official Exam-Center: http://www.certgod.com/ST0-096.html

QUESTION NO:49

A solution implementer needs to integrate the following security profile.

What must the solution implementer do to a message to satisfy this policy?

A. Encrypt and sign the body of the message.

B. Encrypt the body and header. Sign BOTH body and header.

C. Encrypt the body, sign the message and use an X.509 Token.

D. Encrypt the body, sign the Parts, and use an UsernameToken.

Correct Answer: C

QUESTION NO:169

An application needs to log into an existing backend with the fields username, password, pin code and

account number. Which set of actions does the developer need to take in addition to creating a custom

Java Authenticator?

A.

– Use the auth.js as is to display the login form- Configure the authenticationConfig.xml- Create client-

side authentication components

B.

– Configure the authenticationConfig.xml- Configure the worklight.properties- Create client-side

authentication components

C. – Configure the authenticationConfig.xml- Create a custom Java Login Module- Create client-side

authentication components

D. – Configure the authenticationConfig.xml- Create a custom Java Login Module- Use the auth.js as is to

display the login form

Correct Answer: C

QUESTION NO:32

A mainframe customer would like to receive a proposal for a mainframe storage system with 120 TB raw

capacity. The mainframe server load is not too high, and they need hard disk drives with the lowest

possible power consumption to keep operating costs low. The customer will not increase the capacity of

their mainframe applications in the future but rather invest later into their System p servers. Which of the

following solutions best meets these requirements at the lowest cost?

A. offer a DS8700 system with 600 GB FC drives

B. offer a DS8800 system with standard cabling and 600 GB SAS drives

C. offer a DS8800 system with business class cabling and 600 GB SAS drives

D. offer a DS8800 system with SATA drives

Correct Answer: C

QUESTION NO:137

Which option describes one of the purposes of a manual IPL?

A. It is required to apply PTFs.

B. It allows more control over the system startup process.

C. It is the only way to start the system when there is a console problem.

D. It is required to recover the system from a previous abnormal system end caused by ENDJOBABN.

Correct Answer: B

QUESTION NO:44

What is the correct order of install tasks for an LPAR in a p5 590 with AIX 5.3 using the Create

Logical Partition Wizard? 1. Select capped or uncapped 2. Create partition ID 3. Specify desired

minimum physical processing units 4. Name first profile

A. 2, 4, 3, 1

B. 4, 2, 1, 3

C. 2, 4, 1, 3

D. 4, 2, 3, 1

Answer: A